Fees & Charges

Effective October 1, 2025, DC Water will implement a new fee structure for various miscellaneous charges, including those related to customer support, permitting, and operational services. This revised approach aims to improve transparency, simplify billing, and reduce administrative delays by shifting several fees from a reimbursable cost model to a fixed fee format, particularly for development and construction projects. The complete list of fees and charges can be found in the Approved Board Resolution

To navigate directly to specific sections, you can either click on the links provided below or scroll through to explore all available options.

Table of Contents


Small Project and Hybrid Project Plan Review Fees

Fee Name Standard Fee Expedited Review Fee Standard Review Time* (Business Days) Expedited Review Time* (Business Days)
Small Project Base Plan - 1st Submission Administrative Fee – All Small Projects $215 N/A N/A N/A
Small Project Rejected Plan
Resubmission Administrative Fee - All Small Projects
$110 N/A N/A N/A
Small Project Sheet and Shore - All
Small Projects
$1,325 $2,650 14 7
Small Residential Project per meter connection $1,590 $3,180 14 7
Small Non-Residential Project per meter connection $5,300 $10,600 21 11
Small Hybrid Project per meter connection $7,155 $14,310 21 11
Small Residential Approved Plan
Revision (APR) per metered connection
$530 $1,060 14 7
Small Non-Residential or Hybrid APR per metered connection $1,540 $3,075 21 11
Small Residential, Small Non- Residential or Small Hybrid Raze Permit Review and Utility Release Letter - No Abandonment $425 $850 14 7
Small Project Raze Permit Review and Utility Release Letter – With Abandonments $1,060 $2,120 14 7
Small Non-Residential Temporary Water Connections $2,120 $4,240 21 11
Small Project Sanitary or Combined
Sewer connection 6" or less
$1,060 $2,120 14 7
Small Project Storm sewer connection only less than 15" $,1060 $2,120 14 7
Small Residential Plan Excessive Submission Review (5th review or more) per meter connection $530 N/A Based on No. of metered connections Based on No. of metered connections
1 to 5 metered connections     14 7
6 to 20 metered connections     21 11
21 to 50 metered connections     40 20
greater than 50 metered connections     50 25
Small Non-Residential and Small Hybrid Plan Excessive Submission Review (5th review or more) $795 N/A Based on No. of metered connections Based on No. of metered connections
1-3 metered connections     21 11
4 or more metered connections     30 15

*Review times are estimated; Actual time may vary.

Back to top

Large Project Plan Review Fees

Fee Name Standard Fee Expedited Review Fee Standard Review Time* (Business Days) Expedited Review Time* (Business Days)
Large Project Base Plan - 1st Submission Administrative Fee $215 N/A N/A N/A
Large Project Rejected Plan Resubmission Administrative Fee $110 N/A N/A N/A
Large Project Plan Review Fee per meter $15,900 $ 31,800 30 15
Large Project Foundation to Grade $1,860 $3,710 21 11
Large Project Approved Plan Revision (APR) $2,120 $4,240 14 7
Large Project Sheeting and Shoring $13,250 $26,500 30 15
Large Project Temporary Water Connections $5,300 $10,600 21 11
Large Fire Service Only
Greater than 2” - with no interior renovations
$5,300 $10,600 21 11
Large Sanitary or Combined Connection Only 8” or larger $5,300 $10,600 21 11
Large Storm Connection Only 15” or larger $5,300 $10,600 21 11
Large Water Meter Size Reduction Plan (with no other work) $5,300 $10,600 21 11
Large Project Raze Only
Utility Release Letter - No Abandonments
$530 $1,060 14 7
Large Project Raze Only Utility Release Letter – With Abandonments $1,590 $3,180 14 7
Utility Infrastructure Only Review Fee (0 to 1,000 linear feet of water and/or sewer mains) $10,600 $21,200 30 15
Utility Infrastructure Only Review Fee (1,000 – 2,500 linear feet of water and/or sewer mains) $15,900 $31,800 30 15
Utility Infrastructure Only Review Fee (greater than 2,500 linear feet of water and/or sewer mains) $19,080 $38,160 30 15
Large Plan Excessive Submission Review (5th review or more) $3,710 $7,420 30 15

*Review times are estimated; Actual time may vary.

ProjectDox

Fee Name Standard Fee
ProjectDox Signoff on Category I & II and Swimming Pool $200
Non-DC Water Zone of Influence (ZOI) Sheeting and Shoring (not within the influence of DC Water’s assets) $500
ProjectDox Foundation to Grade $500
Non-Department of Transportation (DDOT) BCIV Permit (non-DDOT
BCIV) (Any project that is not DDOT related)
$500
BCIV Permit Erosion Sediment Control (BCIV ESC) $500

Miscellaneous Fees

Fee Name Standard Fee Expedited Review Fee Standard Review Time* (Business Days) Expedited Review Time* (Business Days)
Request for Information (RFI) $190 $375 20 10
Request for As-Built Drawings $215 $425 20 10
Water and Sewer Availability Letter $795 $1,380 14 7
One Day Plan Design and Review and Approval (Velocity Sign-Off Program) $26,500 N/A 1 N/A
Easement and Covenant Fees        
Processing of Standard Easement and Covenant (Initial Document) $2,120 $4,240 14 7
Processing of Non-Standard Easement and Covenant (Initial Document) $9,010 $18,020 21 11
Meter Relocation Fees        
Large Meter Relocation Fee $5,000 N/A N/A N/A
Small Meter Relocation Fee (Non-Residential/Multi- Family) $2,500 N/A N/A N/A
Small Meter Relocation Fee (Residential) $1,500 N/A N/A N/A
Reconfiguration of Fire System Fees        
Reconfiguration of Fire System 
(adding small Fire Split, 2” or less)
(Non-Residential/Multi-Family)
$2,500 N/A N/A N/A
Reconfiguration of Fire System (adding small Fire Split, 2” or less) (Residential) $1,500 N/A N/A N/A

*Review times are estimated; Actual time may vary.
1 ZOI = Zone of Influence
2 BCIV = Building Civil Permit
3 ESC = Erosion Sediment Control
 

Fire Hydrant Flow Test

Fee Name Fee
Fire Hydrant Flow Test (Field Test) $340
Fire Hydrant Flow Test (Computer Model) $340
Fire Hydrant Flow Test (Recent Test Record Available) $145
Letter in Lieu of Hydrant Flow Test $265

As-Built Fee

Fee Name Fee
Small Residential $265 (each bldg.)
Small Non-Residential $265 (each bldg.)
Small Hybrid $265 (each bldg.)
Large Project $795 (Each Connection – water or sewer)
Installation of New Water or Sewer Main (20 to 100 feet) $2,650
Each additional 200 feet of Water Main $2,120
Each additional 400 feet of Sewer Main $2,120
Installation of Water Main - larger than 24" in diameter Determined on a per project basis
Installation of Sewer Main - larger than 60” in diameter Determined on a per project basis

Construction Inspection Fees

Inspection Fees Fee
Inspect Pointing Up Sewer Taps $970
Inspect Insertion of Y-Branch $345
Inspect Installation of Standard Cleanout $345
Inspect Sewer Tap Removal $345
Meter Setter Inspection $265
Meter Setter Re-Inspection $265
Meter Vault Inspection $1,060
Meter Vault Re-Inspection $1,060
Inspect pre-cast concrete vault for new meters $4,000
Inspect installation of fire hydrant relocation $3,000
Inspect installation of new fire hydrant $3,000
Inspect new 8", 10", 12" water main $7,000 + $12/LF
Inspect new 16", 20" water main $10,000 + $12/LF
Inspect new ≥24" water main $14,000 + $12/LF
Inspect new 10"–15" diameter sewer main $7,000 + $12/LF
Inspect new 18"–30" diameter sewer main $10,000 + $12/LF
Inspect new 36"–48" diameter sewer main $20,000 + $12/LF
Inspect new ≥54" diameter sewer main $25,000 + $12/LF
Inspect new sewer manhole/Catch Basin 0–10 vertical feet (vft) $5,000
Inspect new sewer manhole/Catch Basin >10 ≤ 20 vft $8,000
Inspect new sewer manhole/Catch Basin >20 ≤ 30 vft $15,000
Inspect new sewer manhole/Catch Basin >30 vft $20,000
Inspect sewer CCTV ≤ 24" public sewer main $1,300 + $13/LF
Inspect sewer CCTV 24"–36" public sewer main $1,500 + $15/LF
Inspect sewer CCTV 42"–48" public sewer main $1,700 + $17/LF
Inspect sewer CCTV 54"–72" public sewer main $2,000 + $20/LF
Inspect sewer CCTV > 72" public sewer main $4,000 + $40/LF
Inspect sewer CCTV and relining ≤ 24" public sewer $2,300 + $23/LF
Inspect sewer CCTV and relining 24"–36" public sewer $2,900 + $29/LF
Inspect sewer CCTV and relining 42"–48" public sewer $3,400 + $34/LF
Inspect sewer CCTV and relining 54"–72" public sewer $4,000 + $40/LF
Inspect sewer CCTV and relining > 72" public sewer $8,000 + $80/LF

Water Taps and Connections Fees 

(follow website layout with new fee)

Tap Insertion and Abandonment Fee Fee
Tap Insertion – 1” diameter                                $485
Tap Insertion – 1-1/2” diameter $565
Tap Insertion – 2” diameter $610
Water Connection 3” and Larger $2,650
Water Tap Removal/Abandonment – 2” diameter or less $455
Water Tap Removal/Abandonment – greater than 2” diameter $905

Water Quality Fees

Fee Name Fee
Fats, Oil and Grease (FOG) Facility Monthly Fee $24.50 per month
Cross-Connection/Back Flow Prevention Monthly Fee per Assembly   $6.20

Cross-Connection/ Back Flow Prevention Fees and Turn-Off Charges

Connections Fees Fee
Cross-Connection - Water Service Disconnection - 5/8” to 2” $230
Cross-Connection - Water Service Disconnection - 3” to 5” $455
Cross-Connection - Water Service Disconnection - 6” and larger $1,015

Customer Service

Fee Name Fee
Customer Bad Check Fee                   $35
Customer Penalty Late Payment Fee           10.00% after 30 days
Additional Penalty Late Payment Fee 1%/month after 60 days, compounded monthly
New Customer Account Initiation Fee $60
Disconnection Fee $60
Reconnection Fee – Residential Customer $55
Reconnection Fee – Multi-Family and Non-Residential Customer $110
Unauthorized Water or Sewer Connection
First Offense        $400
Second Offense $800
Each Subsequent Offense $1,200
Notice of Follow Up (NOFOL) Compliance Fee $505
Broken Bypass Seal $790
Second Water Audit within 24 months $145
Manual Meter Reading Fee Residential1      $25 per month/meter
Manual Meter Reading Fee* 5/8”-2”
Multi-Family and Non-Residential
$110 per month/meter
Manual Meter Reading Fee* 3”-4””
Multi-Family and Non-Residential
$265 per month/meter
Manual Meter Reading Fee* 6” & greater Multi-Family and Non-Residential $530 per month/meter

1 The Manual Meter Read Fee is charged, after notice, when the meter reads are not transmitting and 1) customer does not provide access to the premises for DC Water to read the meter, 2) customer does not provide access to the premises for DC Water to maintain the meter or meter transmission system, or 3) customer fails to perform corrective action necessary for DC Water to install or maintain the meter or meter transmission system.

Fire Hydrant Use Fees

Fee Name Fee
Fire Hydrant Use – Water and Sewer Rate Usage-Based, see 21 DCMR Chapter 41
Fire Hydrant Permit Fee $80
Private Fire Hydrant Flush $100
3” Fire Hydrant Meter Deposit $2,000 per rental
3” Fire Hydrant Meter Rental <15 days $225
3” Fire Hydrant Meter Rental ≥15 days $15 per day
3” Fire Hydrant Meter w/Backflow Preventer Deposit $3,000 per rental
3” Fire Hydrant Meter w/Backflow Preventer Rental <15 days $300 per rental
3” Fire Hydrant Meter w/Backflow Preventer Rental ≥15 days $20 per day
5/8” Fire Hydrant Meter w/Backflow Preventer Deposit $1,000 per rental
5/8” Fire Hydrant Meter w/Backflow Preventer Rental <15 days $225 per rental
5/8” Fire Hydrant Meter w/Backflow Preventer Rental ≥15 days $15 per day
 

Event and Equipment Fee

Size of Event (Attendees) Number of DC Water Personnel Per Event* Cost per Event 100/hour per person
100 – 2,000 2 $200/hour
2,000 – 5,000 4 $400/hour
5,000 or more 6 $600/hour

* Refers to the minimum number of personnel required for the event. Upon review of the event specifications, DC Water shall determine the appropriate number of personnel based on the assessed need.

Event Equipment Cost per Unit per Event1
Misting Tent $625/day
Cooling Station $480/day
DC Water Mascot $85/hour

Industrial User Permitting & Sampling Fee to recover the cost of service

Fee Name Fee
Waste Hauler Discharge Annual Permit Fee per Vehicle $55
Waste Hauling Disposal Fees
High strength grease trap waste $0.091 per gallon
High strength septage waste $0.091 per gallon
Domestic strength waste $0.004 per gallon
Low strength waste $0.004 per gallon

Industrial User Permit Fees

Industrial User Permit Fees
Permit Initial Fee $3,040
Permit Renewal Fee $1,015

 

Industrial User Annual Compliance Fees Fees
Significant or Non-Significant Categorical Industrial User – 1 Outfall $3,490
Significant or Non-Significant Categorical Industrial User – 2 or more Outfalls $4,835
Significant Non-Categorical Industrial User Fees – 1 Outfall $3,490
2 or more Outfalls $4,835
Non-Significant Non-Categorical User – 1 Outfall $790
Non-Significant Non-Categorical User – 2 or more Outfalls $1,015

 

High Strength Waste Fees Fees
Biochemical Oxygen Demand (BOD) $0.151 per pound
Total Suspended Solids (TSS) $0.350 per pound
Total Kjeldahl Nitrogen (TKN) or Total Nitrogen (TN) $1.526 per pound
Total Phosphorus (TP) $9.815 per pound
Sampling and Analysis Fees Fees
PFAS  
1st Sample $895/sample
Each Additional Sample $420/sample

Freedom of Information Act Request Response Processing Fees

FOIA Fee Name Fees
FOIA Document Search Fee Hour(s) x Staff Base Salary/hr.
FOIA Document Review & Redaction Fee Hour(s) x Staff Base Salary/hr.
FOIA Document Duplication Fee
Standard Letter and Legal Page $0.75 per sheet
Electronic Conversion Fee Hour(s) x Staff Base Salary/hr.
Legal and Copying Fees Fees
Witness Fee $40 + Travel Expenses
DC Water Staff Expert Witness Fee Hour(s) x (Base Salary + Fringe) $/hr. + Travel Expense
Document Duplication Fee $0.75 per sheet
Standard Letter and Legal Page $0.75 per sheet

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Aerial View of Construction near Watergate Complex Shows cranes and construction of drop shaft underway
Scaffolding Installation Begins near Watergate Complex for Potomac River Tunnel Project

Rock Creek and Potomac Parkway NW Beginning September 23, 2025, to Mid-November 2025

DC Water is installing temporary scaffolding at the Rock Creek Trail site, west of the Watergate Complex. Trail users are advised to adhere to flagger instructions during installation.

Scaffolding installation is expected to be completed by September 26, 2025, and will remain in place until mid-November 2025.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.