Cleaning Water and Recovering Resources

Wastewater enters the sewer system from homes, businesses, schools and other buildings from indoor plumbing. This wastewater then travels through miles of underground pipes to the Blue Plains Advanced Wastewater Treatment plant in the District for treatment.

The first treatment phase begins as debris and grit and are removed from the wastewater and then trucked to a landfill. The sewage then flows into primary sedimentation tanks. These tanks separate more than half of the solid waste from the liquid waste through settling.

Wastewater from the primary treatment phase then flows into secondary treatment tanks containing microbes. To break down the organic matter found in the wastewater, the microbes need oxygen so air is pumped into the tanks. In the next stage of treatment, microbes convert ammonia into harmless nitrogen gas. Most of the remaining solids are then settled out and the water flows down through sand filters that remove any suspended solids and associated phosphorus. The water is finally disinfected, dechlorinated and sent back into the Potomac River.

The solids, or sludge, from the primary sedimentation tanks flow into large tanks where the sludge settles to the bottom and thickens. The solids removed from the secondary and nitrification tanks are thickened separately using flotation thickeners. The solids are then blended together, screened, and dewatered. They are then sent through a thermal hydrolysis process that uses to heat and pressure to eliminate pathogens and prepare them for the digesters. After the solids go through digestion, they are dewatered again and sent out as Class A Biosolids to be used as fertilizer.

A more detailed description of the wastewater treatment process can be found in our Blue Plains Advanced Wastewater Treatment Plant Brochure

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

DC Water Officials with NPS and ANC commissioners doing ceremonial groundbreaking
DC Water Breaks Ground on Piney Branch Tunnel, Final Phase of DC Clean Rivers Project

Today, DC Water broke ground on the Piney Branch Tunnel, the final major tunnel in our Clean Rivers Project. This work will help keep sewage and trash out of local waterways and make Rock Creek, the Potomac River, and the Chesapeake Bay cleaner for our community.

When we finish the Piney Branch Tunnel, it will hold at least 4.2 million gallons of rainwater and wastewater during heavy storms. Instead of overflowing into Piney Branch, that water will go to the Blue Plains Water Resource Recovery Facility, where it will be treated.

Latest Blog Post
Five photos from the American Water Works Association (AWWA) ACE26 conference featuring panel discussions, technical presentations, networking, and attendees posing at the ACE26 display.
ACE26 Highlights: How DC Water Advanced the Conversation on Water
More than 80 DC Water employees joined thousands of water professionals in Washington, D.C., sharing expertise, building partnerships and advancing conversations that will help shape the future of water.
Upcoming Meeting
Date
July 13, 2026
Monday, 2:00 PM

Upcoming Events

Jul 23
Jul 25

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.