Early settlers in the District of Columbia were dependent upon local springs for their water needs. Three downtown sections of the city were supplied by the following springs: the City Spring on the north side of C Street, NW, between 4th and 6th Streets; Caffery's Spring (or the Hotel Spring) at the northwest corner of 9th and F Streets, NW; a spring on the public space property located at 13th Street, NW, north of Eye Street; another further west, near the center of Franklyn Park, (now Judiciary Square); and, Smith Spring, now the McMillan Reservoir. Other springs provided water to other existing neighborhoods at that time. 

The earliest documented instance of piping water throughout the D.C. streets for public use was in 1808. At that time, the city permitted residents living in the 600 block of Pennsylvania Avenue, NW, to "convey" water from the city spring to their neighborhood. 

The first appropriation of public funds for a project to pipe water for residential use was on August 4, 1809. The District of Columbia Government allocated three hundred dollars for pipe construction to convey water from Caffery's Spring to the northwestern Pennsylvania Avenue vicinity, specifically between 9th and 14th streets. The spring water piping systems were replaced and extended from year to year.  

By 1850, Pennsylvania Avenue, from First to 15th Streets, and to the north of Pennsylvania Avenue were supplied with pipes that were primarily used for public hydrants or "pumps". By 1909, most spring lines had lost favor with residents and were replaced by new pipe extensions. 

In an 1850 congressionally funded engineering study, the District's principal water source was identified as the Potomac River. The majority of the work on the study was done under the leadership of Lieutenant Montgomery C. Meigs, who later served as Quartermaster General of the Army. Lt. Meigs is credited with planning and building the structures and facilities that became the Washington Aqueduct. Water first reached the District through the Water Aqueduct system on January 3, 1859. 

As originally designed, the Washington Aqueduct system was believed to be sufficient for the future water needs of the city. However, by 1902, it was no longer adequate due to population growth and the need for a filtration system. Therefore, in 1905, a 75 million gallon per day (MGD) slow-sand plant was added at the McMillan Reservoir and the large Bryant Street high-lift pumping station was built.  

Following World War I, the area experienced another sharp increase in population and a new 80 MGD rapid-sand filter was built in Dalecarlia. The continuous population growth of our nation's capital during World War II made it necessary to further expand the water supply system. On February 8, 1946, the District Engineer, the United States Engineering office, and the Engineer Commissioner of the District of Columbia submitted a joint report to Congress that contained comprehensive plans to construct, improve and add to the existing water system. 

For more than thirty years, implementation of the plan underwent periodic modifications through changing requirements and increases in necessary funding.

 
 

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Last gantry at the bottom of the shaft where crews connect it
Now Fully Assembled, It’s Full Speed Ahead for the tunnel boring machine Mary and the Potomac River Tunnel

Final Gantry Completes Mobile Support Train Behind Mary Stretching More Than 700 Feet

DC Water’s tunnel boring machine Mary may be the muscle behind the Potomac River Tunnel Project, but the gantries that trail behind her form the heart, brains, and guts of the operation. Now crews have lowered and connected the final gantry section, giving Mary the tools and equipment she needs to continue tunneling north.

Latest Blog Post
Emergency supplies arranged on a table, including bottled water, canned food, a backpack, first aid kit, flashlight, phone, medication and other essential items.
Simple Ways to Stay Prepared at Home
A few simple steps can help your household prepare for severe weather and temporary water or sewer service interruptions.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.