Annual Spring Cleaning for Region’s Water Pipes Begins Monday April 5

March 29, 2021
Filling water glass from faucet

The District of Columbia, Arlington County and northeastern Fairfax County will clean out their tap water network starting Monday—a safe, annual process. Water service continues uninterrupted during the process, which runs from April 5 through May 17. During that time, drinking water may smell or taste slightly different. 

The U.S. Army Corps of Engineers’ Washington Aqueduct, water supplier to these regions, performs the temporary disinfectant switch from chloramine to chlorine to allow local water authorities to clean the pipes and maintain water flow. Washington Aqueduct continues to add a corrosion inhibitor during the process to reduce the potential for release of lead in service lines.

Local water authorities will continually monitor the drinking water for safe chlorine levels as well as conduct system-wide flushing to enhance water quality. At the same time, water utilities will systematically flush fire hydrants by opening them up to allow fresh water to flow through the system. Crews operating hydrants in this manner are a normal part of this routine. This process is repeated nearly every spring, in this region and across the nation.

This temporary cleaning often adds a new smell or taste to tap water. If customers opt, they can run the cold water tap for about two minutes, then use a water filter or allow water to sit in a container in the refrigerator to remove chlorine taste and odor.

Customers who take special precautions to remove chloramine from tap water should continue such methods during the temporary switch to chlorine. As always, those with special concerns should consult their health care provider.

Washington Aqueduct is the wholesale water supplier for the District of Columbia, Arlington and northeastern Fairfax County.

For more information, please contact the appropriate water authority:

  • DC Water: dcwater.com/chlorine-switch; 202-612-3440 (Monday-Friday, 8:00 a.m. - 4:30 p.m.) or 202-612-3400 (24-hour)
  • Arlington County: 703-228-5000 (Monday-Friday, 7:00 a.m. - 7:00 p.m.) or 703-228-6555 (24-hour)
  • Fairfax Water: 703-698-5800 (Monday-Friday, 8:00 a.m. - 6:00 p.m.) or 703-698-5613 (24-hour)

Latest News

Photo of soil removal and excavation

DC Water and its contractor have removed all the soil down to the clay liner between locks 12 and 13, marking 50% completion of the canal clean-up. Soil removal between Locks 13 and 14 was completed earlier this month. Meanwhile, clean-up efforts continue between locks 10 and 12, with sludge removal complete and soil removal now underway.

View of Mary at bottom of shaft inside tunnel shown from above

First turn of cutterhead signals the start of excavation for the Potomac River Tunnel Project

In a defining moment for one of the District’s largest infrastructure investments, DC Water has marked its next major milestone in the Potomac River Tunnel Project. The first tunnel boring machine, Mary, has launched her northbound journey breaking through the soil to signal the start of excavation.

Photo of the vegetation growing back in the culvert area

DC Water has completed soil removal, utilizing excavators and manual digging, to expose the clay lining for the C & O Canal between locks 13 and 14. This is the final step in the clean-up process before work can begin to rebuild the canal. Work continues on the remaining lock sections, with soil removal nearing completion between locks 12 and 13.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

View of Mary at bottom of shaft inside tunnel shown from above
DC Water Launches Tunnel Boring Machine Mary, Marking Important Step for Potomac River Tunnel Project

First turn of cutterhead signals the start of excavation for the Potomac River Tunnel Project

In a defining moment for one of the District’s largest infrastructure investments, DC Water has marked its next major milestone in the Potomac River Tunnel Project. The first tunnel boring machine, Mary, has launched her northbound journey breaking through the soil to signal the start of excavation.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
April 23, 2026
Thursday, 9:30 AM

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.