REHABILTATION OF 26TH AND K STREET NW PUMPING STATION FOGGY BOTTOM AREA – ANC 2A

Map of Project Area

OVERVIEW

DC Water is undertaking the rehabilitation of the 26th and K Stormwater Pump Station, which is currently operating below its intended capacity. This condition presents a significant risk of flooding to roadways within the District of Columbia, including designated emergency evacuation routes. The proposed improvements are intended to restore full operational capacity, enhance system reliability, and mitigate the risk of flooding in this critical area.

                                   

PROPOSED SCOPE OF WORK

  • Interior replacement of Five (5) stormwater pumps, associated piping, valves, and appurtenances.
  • Interior replacement of Motor Control Center and other electrical equipment.
  • Interior replacement of existing HVAC system, including addition of a vestibule to separate ventilated areas.
  • Exterior addition of a generator tie-in panel and interior addition of an Automatic Transfer Switch for emergency backup power.
  • Trenching to support installation of new underground bank-one 6x4” duct bank from property line to the pump station Electrical Room to provide power to new equipment, and one 3x4” duct bank from generator quick connect switchboard to Automatic Switch inside the pump station, Electrical Room 
  • Interior addition of a monorail hoist and replacement of stairs.
  • Interior addition of a dewatering pipe from the wet well to grade to dewater the wet well with a vac truck.
  • Other interior structural, architectural, and instrumentation work to support the project.

                        

SCHEDULE

  • Construction start: March 2026
  • Construction completion: June 2028
  • Normal work hours: 7:00 am to 7:00 pm, Monday through Friday
    • Contractor may work at night or on weekends, dependent upon certain construction activities or inclement weather

 

IMPORTANT INFORMATION

  • DC Water will work to achieve minimal disruption during construction operations.
  • Noise and vibrations will be closely monitored throughout the project.
  • For any necessary temporary interruption of sewer services during construction, affected customers will be notified 7 days in advance.

                                            

TRAFFIC

  • Flagging operations may be used daily for each construction phase to maintain traffic in the construction work zone. All Traffic Control Plans will be approved by the District Department of Transportation (DDOT).
  • During construction, “no-parking” signs may be placed in certain areas in and around the job site. Notifications regarding “no-parking” zones will be posted 72 hours prior to construction, as required by DDOT.

 

PARTNER

DC Water is working to ensure minimal disruption during this project. Regular updates will be provided to impacted residents, Advisory Neighborhood Commission 2A, Ward 2 representatives in the Mayor’s Office of Community Relations and Services, and Ward 2 Councilmember Brooke Pinto and members of her staff.  

 

 

 

Contact Information

FOR MORE INFORMATION, PLEASE CONTACT:

DC Water Project Manager
Devendra Mahajan
(443) 779-9475
Devendra.Mahajan@dcwater.com 

DC Water Project Contractor
ACE Services Inc.
George Strish
(240) 749-4487
George.Strish@aceservinc.com 

 

DC Water Standard Contacts

DC Water Quality and Technology Division
(202) 612-3440 

DC Water 24-hr Emergency/Command Center
(202) 612-3400

DC Water Office of Marketing and Communications
(202) 787-2200

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

DC Water Officials with NPS and ANC commissioners doing ceremonial groundbreaking
DC Water Breaks Ground on Piney Branch Tunnel, Final Phase of DC Clean Rivers Project

Today, DC Water broke ground on the Piney Branch Tunnel, the final major tunnel in our Clean Rivers Project. This work will help keep sewage and trash out of local waterways and make Rock Creek, the Potomac River, and the Chesapeake Bay cleaner for our community.

When we finish the Piney Branch Tunnel, it will hold at least 4.2 million gallons of rainwater and wastewater during heavy storms. Instead of overflowing into Piney Branch, that water will go to the Blue Plains Water Resource Recovery Facility, where it will be treated.

Latest Blog Post
Five photos from the American Water Works Association (AWWA) ACE26 conference featuring panel discussions, technical presentations, networking, and attendees posing at the ACE26 display.
ACE26 Highlights: How DC Water Advanced the Conversation on Water
More than 80 DC Water employees joined thousands of water professionals in Washington, D.C., sharing expertise, building partnerships and advancing conversations that will help shape the future of water.
Upcoming Meeting
Date
July 17, 2026
Friday, 2:00 PM

Upcoming Events

Jul 23
Jul 25

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.