SMALL DIAMETER WATER MAIN REPLACEMENT PROJECT Berkley, Foxhall, Kent, Palisades, Spring Valley, and Wesley Heights Neighborhoods. ADVISORY NEIGHBORHOOD COMMISSION 3D

Repaving after repair.

OVERVIEW

As part of its Capital Improvement Program, DC Water is replacing existing 12-inch and smaller cast iron water mains in various locations throughout the city. Construction for this project will occur, (see construction location map on the back). These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system.

SCOPE OF WORK

• Installation of approximately 1,000 linear feet of 8-inch watermain

• Replacement ofservice lines – including free private side replacement of lead and galvanized iron pipe

• Replacement of fire hydrants andvalves

• Restoration of allsurfaces disturbed by the project construction upon completion of work

SCHEDULE

• Construction start: October 2024

• Construction completion: January 2028

• Normal work hours: 9:30 AM to 3:30 PM, Monday through Friday

The contractor may, at times, need to work at night or on weekends, dependent upon certain construction activities or due to inclement weather.

IMPORTANT INFORMATION

• For all planned temporary water service shut-offs, affected residents will be notified 48 hours in advance. Service interruptions should be minimal.

• Construction activities such as these may cause temporary discolored water or low water pressure. If you experience discolored water, it is recommended that you flush your cold water tap from the lowest point inside your property for approximately 15 minutes. If your water does not clear after this process, please contact DC Water’s Water Quality and Technology Division or our 24-hr Emergency/Command Center.

TRAFFIC

• Flagging operations and lane closures may be required daily for each construction phase to maintain traffic in the construction work zone. All Traffic Control Plans will be approved by the District Department of Transportation(DDOT).

• Notifications regarding “No Parking” zones will be posted 72 hours prior to construction, in certain areas in and around the job site, as required byDDOT.

PARTNERS

DC Water is currently working closely with DDOT to ensure minimal traffic disruptions during this project. Regular updates will also be provided to impacted residents, Advisory Neighborhood Commission 3D, Ward 3representatives in the Mayor’s Office of Community Relations and Services, and Ward 3 Councilmember Matthew Frumin and members of their staff.

 

Contact Information

FOR MORE INFORMATION, PLEASE CONTACT 

DC Water Project Manager: John Ingle (202) 313-1541/ john.ingle@dcwater.com

 DC Water Project Contractor: TBD 

DC Water Water Quality and Technology Division: (202) 612-3440 

DC Water 24-hr Emergency/Command Center: (202) 612-3400 

DC Water Office of Marketing and Communications: (202) 787-2200

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

View of the Alexandria Aqueduct
Capital Crescent Trail: Temporary Travel Lane, Trail Detours, and Parking Restrictions

(Washington, DC) –As a part of DC Water’s Potomac River Tunnel Project, temporary traffic lane closures, trail detours, and parking restrictions wi

Latest Blog Post
Photo of Great Falls of the Potomac River with fast moving rapids going over the falls
The Critical Need for a More Resilient Water Source and Protecting the One We Have
Source Water Protection Week highlights the case for second water source.
Upcoming Meeting

Upcoming Events

Nov 14