Overview

As part of its Capital Improvement Program, DC Water is replacing existing 12-inch and smaller cast iron water mains in various locations throughout the city. Construction for this project will occur in the Fort Dupont neighborhood (see construction location map on back). These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system.

Scope of Work

  • Installation of approximately 7,030 linear feet of 3-inch up to 16-inch water mains
  • Replacement of service lines – including free private side replacement of lead and galvanized iron pipe
  • Replacement of fire hydrants and valves

Schedule

  • Construction start: October 2023
  • Construction completion: February 2026
  • Normal work hours: 9:30 AM to 3:30 PM, Monday through Friday

The contractor may, at times, need to work at night or on weekends, dependent upon certain construction activities, or due to inclement weather.

Important Information

  • For all planned temporary water service shut-offs, affected residents will be notified 48 hours in advance. Service interruptions should be minimal.
     
  • Construction activities such as these may cause temporary discolored water or low water pressure. If you experience discolored water, it is recommended that you flush your cold water tap from the lowest point inside your property for approximately 15 minutes. If your water does not clear after this process, please contact DC Water’s Water Quality and Technology Division, or our 24-hr Emergency/Command Center.

Traffic

  • Lane closures and flagging operations may be required daily for each phase of construction to maintain traffic in the construction work zone. All Traffic Control Plans will be approved by the District Department of Transportation (DDOT).
     
  • Notifications regarding “No-Parking” zones will be posted 72 hours prior to construction, in certain areas in and around the job site, as required by DDOT.

Partners

DC Water is currently working closely with DDOT to ensure minimal disruption during this project. Regular updates will also be provided to impacted area residents, Advisory Neighborhood Commission 7F, Ward 7 representatives in the Mayor’s Office of Community Relations and Services, and Ward 7 Councilmember Vincent C. Gray and members of his staff.

Contact Information

FOR MORE INFORMATION, PLEASE CONTACT

Lead Free Group Project Manager
John Ingle 
(202) 313-1541 
john.ingle@dcwater.com 

Lead Free Group Project Inspector
Charles Neale 
(301) 212-0212 

DC Water Project Contractor
Fort Myer Construction Corp. 
Jorge Baptista (202) 359-2969 

DC Water Standard Contacts
Water Quality and Technology Division
(202) 612-3440 

24-hr Emergency/Command Center
(202) 612-3400

Office of Marketing and Communications
(202) 787-2200

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

DC Water Officials with NPS and ANC commissioners doing ceremonial groundbreaking
DC Water Breaks Ground on Piney Branch Tunnel, Final Phase of DC Clean Rivers Project

Today, DC Water broke ground on the Piney Branch Tunnel, the final major tunnel in our Clean Rivers Project. This work will help keep sewage and trash out of local waterways and make Rock Creek, the Potomac River, and the Chesapeake Bay cleaner for our community.

When we finish the Piney Branch Tunnel, it will hold at least 4.2 million gallons of rainwater and wastewater during heavy storms. Instead of overflowing into Piney Branch, that water will go to the Blue Plains Water Resource Recovery Facility, where it will be treated.

Latest Blog Post
Five photos from the American Water Works Association (AWWA) ACE26 conference featuring panel discussions, technical presentations, networking, and attendees posing at the ACE26 display.
ACE26 Highlights: How DC Water Advanced the Conversation on Water
More than 80 DC Water employees joined thousands of water professionals in Washington, D.C., sharing expertise, building partnerships and advancing conversations that will help shape the future of water.
Upcoming Meeting
Date
July 13, 2026
Monday, 2:00 PM

Upcoming Events

Jul 23
Jul 25

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.