Blog Archive
David Gadis meets DC Water employees
We caught up with David Gadis for a pre-interview in the days before he officially took the helm.
Rain gardens like this help keep toxic runoff from parking lots from entering the river system.
Though blue is our favorite color, green is a close second.
Washington DC ornithologist Dan Rauch walks to a morning bird count on Kingman Island, Anacostia Park. Washington DC, 2012.
Water quality and overall health of the Anacostia River have improved impressively, and are only getting better.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Tunnel Boring Machine named Mary undergoing Factory Acceptance Testing
Factory Testing Complete on DC Water’s first tunnel boring machine for the Potomac River Tunnel

Her name is Mary and she’s a tunnel boring machine (TBM) capable of cutting through hard rock and boring a tunnel 21 feet in width.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
May 1, 2025
Thursday, 9:30 AM