Dry Weather Overflow Advisory

November 18, 2021

DC Water was notified at 2:00 p.m. today, November 18, 2021, of a dry weather overflow event at CSO 029 due to a leak from an 18” sewer pipe into a storm sewer pipe that discharges to the Potomac River. The leak is located near 3800 Reservoir Road, NW. DC Water has notified regulatory agencies EPA Region III and DOEE, and stakeholders including District officials and the Coast Guard. We have also contacted the nearby boathouses.  This notification is made out of an abundance of caution. A DC Water crew is on location and has engaged a contractor familiar with this sewer line to further investigate and develop a repair plan. 

The Potomac River is fast moving and this small amount of sewage should dilute quickly. But, as always, the public is advised to stay away from any sewer pipe discharge. It could affect the receiving waters even after the leak is fixed. Anyone on the Potomac today who came in contact with the water near CSO 029 should take precautions by bathing and washing equipment and clothing.

For more information, please contact DC Water’s 24 hour Command Center at 202-612-3400. Information on Dry Weather Overflows can be found here: https://www.dcwater.com/css.

Latest News

graphic with meeting information

We hope to see you tonight for our upcoming Lead Free DC Virtual Meeting! We will discuss Losing the Lead Without Losing Your Yard. This session is an in-depth look at an important concern for many homeowners: how Lead Free DC restores your yard following a lead service line replacement.

Photo of Potomac River at the overflow location

Hundreds of Sampling Results Confirm Return to Normal Bacteria Levels in Potomac River

DC Water has outlined its next steps to complete the environmental cleanup and its plan for continued water quality monitoring this summer, as part of the ongoing response to January’s failure in the Potomac Interceptor sewer pipeline. The plan, submitted to the Maryland Department of the Environment (MDE), is supported by extensive data from hundreds of samples.

crews removing soil in C & O Canal

Work continues to remove the remaining soil between locks 10 and 12 of the C & O Canal which was used as an emergency bypass while the Potomac Interceptor was repaired. Crews area also removing plants, trees, and shrubs in preparation for the long-term rehabilitation of the Potomac Interceptor.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Placeholder DC Water Image
Piney Branch Parkway Temporary Closure and Relocation

DC Water has nearly completed construction site preparation for the Piney Branch Tunnel project, including tree removal, and installation of fences

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

May 16
2:00 pm - 6:00 pm
May 20

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.