SMALL DIAMETER WATER MAIN REPLACEMENT PROJECT CHEVY CHASE NEIGHBORHOOD – ADVISORY NEIGHBORHOOD COMMISSION 3G

150050_8-Inch Valve and piping at Edgewood-6th St, NE_Dec 4 (6).jpg

Overview

As part of its Capital Improvement Program, DC Water is replacing existing 12-inch and smaller cast iron water mains in various locations throughout the city. Construction for this project will occur in the Chevy Chase neighborhood (see construction location map on back). These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system.

 

Scope of work

  • Installation of approximately 4,543 linear feet of 3-inch up to 12-inch water mains
  • Replacement of service lines – including free private side replacement of lead and galvanized iron pipe
  • Replacement of fire hydrants and valves
  • Restoration of all surfaces disturbed by the project construction upon completion of the work

 

Schedule

  • Estimated construction start: Mid-September 2022
  • Construction completion: September 2024
  • Normal work hours: 9:30 AM to 3:30 PM, Monday through Friday

 

The contractor may, at times, need to work at night or on weekends, dependent upon certain construction activities, or due to inclement weather.

 

Important information

  • For all planned temporary water service shut-offs, affected residents will be notified 48 hours in advance. Service interruptions should be minimal.
  • Construction activities such as these may cause temporary discolored water or low water pressure. If you experience discolored water, it is recommended that you flush your cold water tap from the lowest point inside your property for approximately 15 minutes. If your water does not clear after this process, please contact DC Water’s Water Quality and Technology Division, or our 24-hr Emergency/Command Center.

 

Traffic

  • Lane closures may be required daily with approved traffic plans by the District Department of Transportation (DDOT).
  • Notifications regarding “No-Parking” zones will be posted 72 hours prior to construction, in certain areas in and around the job site, as required by DDOT.

 

Partners

DC Water is currently working closely with DDOT to ensure minimal disruption during this project.

Regular updates will also be provided to impacted area customers, Advisory Neighborhood

Commission 3G, Ward 3 representatives in the Mayor’s Office of Community Relations and Services,

and Ward 3 Councilmember Mary Cheh and members of her staff.

 

Contact Information

For more information, please contact

DC Water Project Manager:  Maria Gigova (202)787-7621 / maria.gigova@dcwater.com

DC Water Project Contractor: Fort Myer Construction Corporation-Jorge Baptista (202) 359-2969

DC Water Water Quality and Technology Division: (202) 612-3440

DC Water 24-hr Emergency/Command Center: (202) 612-3400

DC Water Office of Marketing and Communications: (202) 787-2200

 

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Latest Blog Post
Leveraging Green Infrastructure for the Triple Bottom Line
Leveraging Green Infrastructure for the Triple Bottom Line
Leveraging Green Infrastructure for the Triple Bottom Line
Upcoming Meeting
Date
April 23, 2024
Time
Tuesday, 1:30 PM