Brentwood Reservoir Community Solar Project

10.7 DC Water View 1_dark_fence.jpg

Overview

DC Water is developing a community solar project on the capped Brentwood Reservoir located at 1450 Brentwood Ave, NE.  NHT Ingenuity Power (NHT-IP), a joint venture between the National Housing Trust and Urban Ingenuity, and SunLight General Capital, have entered a binding site license with DC Water to own and operate the system for the next 20 years. 

The site is an 18-acre property occupied by an operational reservoir, which supplies water to the District of Columbia.  The reservoir is an underground reinforced concrete structure for potable water storage and was first put into service in 1959.  It has a capacity of approximately 25 million gallons.  The 1.8MW solar installation will use approximately 4000 solar panels, some installed on the reservoir cap and some ground mounted on the southern facing slope.  The system is estimated to produce over 2.5 Million kWh/year, which will be provided 100% free to more than 500 low to moderate income households of the District through the DOEE Solar for All program.

 

Project Location

 

 

Schedule

Construction is scheduled to begin in June 2022.  The system should be operational in Q1 of 2023. 

Contact Information

For More Information Contact:

 202-796-8925 

info@urbaningenuity.com  

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Close-up of the TBM cutterhead suspended by a crane
From Germany to DC, Emily Arrives on a One-Way Ticket to Help Build the Potomac River Tunnel

DC Water’s Newest Tunnel Boring Machine to Dig Tunnel’s Southern Segment

Emily, DC Water’s second tunnel boring machine for the Potomac River Tunnel Project, has arrived at the West Potomac Park construction site. Once assembled and launched, she will excavate the tunnel’s southern section.

Latest Blog Post
DC Water General Manager and CEO David Gadis recognizes Lily MacDonald during the May Board of Directors meeting.
From Classroom to Community: A Student Spotlight on DC Water's SPLASH Program
A speechwriting assignment became a call to action for water access and affordability through DC Water's SPLASH program.
Upcoming Meeting
Date
June 4, 2026
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.