EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Working Together to Build a Sustainable Community

Rain gardens like this help keep toxic runoff from parking lots from entering the river system.
June 15, 2018

Though blue is our favorite color, green is a close second. SustainableDC recently published the District's Sustainability Plan 2.0, a comprehensive framework of action to make the District of Columbia the healthiest, greenest, most livable city in the United States.

DC Water is an environmental steward with simple goals: to protect the environment and deliver the best quality of service possible. We use research, modern technologies, and industry best practices to keep our waterways and land clean and safe. DC Water continues to proliferate green infrastructure, in line with the goals of SustainableDC and the Department of Energy & Environment (DOEE).

The benefits of using green infrastructure—techniques that take advantage of natural processes such as infiltration and evapotranspiration to minimize pollution—to protect rivers and source water are wide-ranging and significant.

DC Water’s ground-breaking Clean Rivers Project uses cutting-edge innovation and practices to improve the health of the Anacostia and Potomac rivers. Combining five impressive tunnels with the implementation of green infrastructure to mitigate combined sewer overflows (CSOs), preventing 96% of CSOs—which would otherwise pollute our rivers—by the year 2030.

DC Water worked with the District Department of Transportation on a green alley partnership to construct permeable pavement in one alley in Ward 2 within the Potomac River sewershed and six alleys in Wards 1 and 4 within the Rock Creek sewershed. This permeable pavement mimics natural conditions to capture (working like a sponge), filter and slow down stormwater runoff before it enters the combined sewer system.

You can help too. DOEE’s RiverSmart Program offers tangible benefits for and assistance to install green infrastructure for homes, communities, schools, and rooftops.

Learn more about DC Water’s green infrastructure program here, and check out and provide feedback for the District's Sustainability Plan 2.0. Working together, we can all make our community a more equitable, livable, sustainable place for generations to come.

Latest Posts

Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
Nov 18, 2026
How Teamwork Helped DC Water Stop Hidden Water Loss
Emergency supplies arranged on a table, including bottled water, canned food, a backpack, first aid kit, flashlight, phone, medication and other essential items.
Aug 21, 2026
A few simple steps can help your household prepare for severe weather and temporary water or sewer service interruptions.
Plastic bottles, cups and other floating debris on the surface of the Anacostia River before the Anacostia River Tunnel began operating.
Jul 21, 2026
Protecting our waterways starts with everyday actions and continues through critical infrastructure designed to keep pollution out of our rivers.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.