EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC Water's

News & Updates

At DC Water, we understand the importance of keeping our community informed about our services, projects, and achievements. Our news web page serves as a reliable source for the latest information on a range of topics.

contract for construction of the Potomac River Tunnel (PRT)
2 August, 2022

Five Draft Action Plans Available for Review and Public Comment Until August 22

RST large crane
7 April, 2022

Some of you may have become accustomed to seeing CC the Colossal Crane towering over the R Street NW construction site. Starting on or about Monday, April 11, 2022, we will say ‘goodbye’ to CC as the contractors will begin working after-hours to remove the large crane from the site. The crane will be disassembled during the day and transported at night between 11:00 p.m. and 5:00 a.m. to reduce ...

contract for construction of the Potomac River Tunnel (PRT)
21 March, 2022
  • Routine disinfectant switch begins today, continues until May 9
  • Regional drinking water system meets all Federal and state safety standards
  • Easy steps provided to eliminate any temporary change in water taste

DC Water, along with Arlington County and northeastern Fairfax County, will clean its tap water networks starting today. Water service continues uninterrupted during the process, which runs from ...

contract for construction of the Potomac River Tunnel (PRT)
17 March, 2022

Two Virtual Public Listening Sessions Scheduled for March 28 and March 31

contract for construction of the Potomac River Tunnel (PRT)
19 November, 2021

As communicated yesterday, DC Water investigated a dry weather overflow event at CSO 029 on the Potomac River. This was due to a leak from an 18” sewer pipe located near 3800 Reservoir Road, NW.

Overnight, crews were able to successfully bypass the leak to contain it and prevent further discharges to the Potomac. However, work to repair the leak was suspended for safety reasons during the periods ...

contract for construction of the Potomac River Tunnel (PRT)
18 November, 2021

DC Water was notified at 2:00 p.m. today, November 18, 2021, of a dry weather overflow event at CSO 029 due to a leak from an 18” sewer pipe into a storm sewer pipe that discharges to the Potomac River. The leak is located near 3800 Reservoir Road, NW. DC Water has notified regulatory agencies EPA Region III and DOEE, and stakeholders including District officials and the Coast Guard. We have also ...

contract for construction of the Potomac River Tunnel (PRT)
17 November, 2021

28 agencies and organizations will meet for one year to develop action plan

contract for construction of the Potomac River Tunnel (PRT)
2 November, 2021

Disconnections may be waived for eligible customers

DC Water urges customers who have a past due balance to get current, get assistance or get on a payment plan, as disconnections for some customers with a past due balance are slated to begin December 1, 2021.

Customer arrears have more than doubled since the beginning of the pandemic and are now at $26.3 million. DC Water CEO and General Manager ...

contract for construction of the Potomac River Tunnel (PRT)
28 October, 2021

The National Weather Service is forecasting a potential severe weather event for the National Capital Region beginning early Friday morning and lasting into Friday evening. 

Tidal flooding is expected to be the major concern. But even without large rain totals, customers may still experience localized flooding.

DC Water is monitoring the forecast and is prepared to address any issues brought on by ...

Wendy
21 October, 2021

U.S. Water Alliance encourages residents to value their tap water


Each October, the U.S. Water Alliance designates a day in which the organization challenges residents to contemplate the water they use every day. The national “Imagine a Day without Water” holiday is October 21 this year and DC Water is celebrating with two pop-up events in the District and the release of a new children’s book about ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.