Temporary Single Lane Conditions Planned for Northbound South Capitol Street

August 02, 2012

(Washington, DC) – DC Water is performing construction activities on South Capitol Street, SE as part of the Clean Rivers Project.

Beginning Monday, August 6, 2012 through Thursday, August 9, 2012, weather permitting, crews will perform work in two of the northbound lanes on South Capitol Street, SE near Anacostia Drive. Although daily working hours will be from 6:30 a.m. to 6:30 p.m., traffic will be reduced to one northbound lane between Anacostia Drive and Suitland Parkway for the duration of this portion of the work.

Southbound lanes on South Capitol Street, SE along this stretch will not be affected by this activity.

This portion of the work will be performed in support of Division A of the Clean Rivers Project (Blue Plains Tunnel).

Important Information:
* One northbound lane on South Capitol Street, SE will be
kept open at all times while this portion of the work
takes place.
* Once this portion of the work is completed, South Capitol
Street, SE will reopen to two northbound lanes.
* Some traffic stops and delays within the vicinity of the
project area are anticipated.

Temporary traffic signs have been set up throughout the area to alert motorists to the upcoming lane closure. To keep everyone safe, motorists should stay alert and obey the posted speed limits when traveling through this area.

Project Details
DC Water is implementing its Long Term Control Plan (LTCP) for the District’s combined sewer system. The LTCP comprises a system of tunnels and diversion sewers for the capture of combined sewer overflows (CSOs) to Rock Creek and the Anacostia and Potomac rivers for treatment at DC Water’s Blue Plains Advanced Wastewater Treatment Plant. Implemented under a Federal Consent Decree between the United States, District Government and DC Water, the LTCP is divided into several contract divisions; the entire project, however, will reduce CSOs annually by 96 percent throughout the system and by 98 percent for the Anacostia River alone.

###

About DC Water
The District of Columbia Water and Sewer Authority (DC Water), is an industry leading multi-jurisdictional regional utility that provides drinking water, wastewater collection and treatment to more than 500,000 residential, commercial and governmental customers in the District of Columbia, and also collects and treats wastewater for 1.6 million customers in Montgomery and Prince Georges counties in Maryland and Fairfax and Loudoun counties in Virginia.

DC Water’s service area covers approximately 725 square miles and the company operates the world’s largest advanced wastewater treatment plant with a capacity of 370 million gallons per day and has a peak capacity of 1.076 billion gallons per day.

Please visit dcwater.com/cleanrivers for more information on the Clean Rivers Project.

Latest News

logo of wssc water and dc water

With excessive rainfall forecasted for the region DC Water and WSSC Water are actively monitoring weather conditions and implementing mitigation strategies to minimize the risk of a controlled emergency sewage overflow from the Anacostia Wastewater Pumping Station (WWPS) in Capitol Heights, Maryland. This action would be taken as a last resort as the agencies work together to protect communities and the environment following the July 20 collapse of the 108-inch diameter Anacostia Sewer Force Main in Northeast Washington, D.C. near Kenilworth Aquatic Gardens.

WSSC Logo and DC Water logo

Weather key factor. Overflow from WSSC Water’s Anacostia Wastewater Pumping Station (WWPS) in Capitol Heights into Beaverdam Creek and Anacostia River is last resort. Would protect Northeast D.C. neighborhood after collapse of 108-Inch Diameter Anacostia Sewer Force Main.

WSSC and DC Water Logos

Overflow at WSSC Water’s Anacostia Wastewater Pumping Station in Capitol Heights May Occur to Avoid Sewage Overflow in Northeast, D.C. Neighborhood Following Failure of the 108-Inch Diameter Anacostia Sewer Force Main Located in the District

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Picture of previous rock slide on the slope
DC Water Revises Canal Road Slope Stabilization Plan in Response to Community Feedback

DC Water has revised its slope stabilization plan along Canal Road Northwest to significantly reduce traffic disruptions during construction.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
September 2, 2025
Tuesday, 10:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.