Northeast Boundary Tunnel Construction Brings Lane Closures to Florida Avenue and 3rd Street Beginning March 10

March 07, 2014

(Washington, DC) – DC Water is performing construction activities on Florida Avenue, NW and 3rd Street, NW as part of the Northeast Boundary Tunnel (NEBT) portion of the Clean Rivers Project.

Beginning Monday, March 10, 2014 through Friday, March 28, 2014, weather permitting, crews will perform field investigation and survey work to assess the NEBT alignment. In preparation for the tunnel construction, DC Water will be conducting drilling and sampling of borings, and installing groundwater monitoring and sampling wells. Normal work hours will be from 7:00am to 7:00pm, Monday through Friday.

There will be lane closures on Florida Avenue and 3rd Street throughout this phase of the work. Closures will occur in one westbound lane on Florida Avenue at 4th Street, and also in one southbound lane on 3rd Street at Florida Avenue. All lane closures will be 24 hours.

Other Important Information:
* Traffic signs have been set up throughout the area to alert motorists to the upcoming traffic changes.
* Some traffic delays within the vicinity of the work zones are anticipated.
* Parking will be restricted within the work zone. Accordingly, “No Parking” signs will be posted 72 hours prior to the work, as required by the District Department of Transportation.
* Noise levels will be closely monitored during construction.

Project Details
DC Water is implementing the Clean Rivers Project which comprises a system of tunnels and diversion sewers for the capture of combined sewer overflows (CSOs) to Rock Creek and the Anacostia and Potomac rivers for treatment at DC Water’s Blue Plains Advanced Wastewater Treatment Plant. The entire project will reduce CSOs annually by 96 percent throughout the system and by 98 percent for the Anacostia River alone.

###

About DC Water
The District of Columbia Water and Sewer Authority (DC Water), is an industry leading multi-jurisdictional regional utility that provides drinking water, wastewater collection and treatment to 600,000 residential, commercial and governmental customers in the District of Columbia, 17.8 million annual visitors and also collects and treats wastewater for 1.6 million customers in Montgomery and Prince Georges counties in Maryland and Fairfax and Loudoun counties in Virginia.

DC Water’s service area covers approximately 725 square miles and the company operates the world’s largest advanced wastewater treatment plant with a capacity of 370 million gallons per day and a peak capacity of 1.076 billion gallons per day.

Latest News

Photo of Potomac River at the overflow location

Hundreds of Sampling Results Confirm Return to Normal Bacteria Levels in Potomac River

DC Water has outlined its next steps to complete the environmental cleanup and its plan for continued water quality monitoring this summer, as part of the ongoing response to January’s failure in the Potomac Interceptor sewer pipeline. The plan, submitted to the Maryland Department of the Environment (MDE), is supported by extensive data from hundreds of samples.

crews removing soil in C & O Canal

Work continues to remove the remaining soil between locks 10 and 12 of the C & O Canal which was used as an emergency bypass while the Potomac Interceptor was repaired. Crews area also removing plants, trees, and shrubs in preparation for the long-term rehabilitation of the Potomac Interceptor.

Placeholder DC Water Image

DC Water has nearly completed construction site preparation for the Piney Branch Tunnel project, including tree removal, and installation of fences, erosion and sediment controls, utilities, and ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Placeholder DC Water Image
Piney Branch Parkway Temporary Closure and Relocation

DC Water has nearly completed construction site preparation for the Piney Branch Tunnel project, including tree removal, and installation of fences

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

May 16
2:00 pm - 6:00 pm
May 20

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.