EMERGENCY WATER MAIN REPAIR
Feb 08, 2026 | 05:30 AM

EMERGENCY WATER MAIN REPAIR
Feb 08, 2026 | 04:30 AM

EMERGENCY WATER MAIN REPAIR
Feb 08, 2026 | 04:00 AM

DC Water Makes First Splash with Children’s Water Drop Festival

October 31, 2011

The District of Columbia Water and Sewer Authority (DC Water) teamed up with the District Department of Parks and Recreation (DPR) to host the first Children’s Water Drop Festival at Watkins Recreation Center on Friday, October 28. This free environmental education event was designed to educate and engage students about a variety of water-related topics and environmental issues impacting the quality of our waterways.

During the festival, staff from DC Water and several environmental organizations gave students a hands-on environmental lesson about drinking water, wastewater treatment, water quality, and the Anacostia watershed. Additionally, students learned how they can protect and conserve water resources.

“Today’s festival is one way we’re reaching out to our next generation of environmentalists and customers,” said DC Water General Manager George S. Hawkins. “Young people are fascinated by how water affects their lives and how the system works. We’re looking forward to working with more students of all ages in the District in 2012.”

Some of the exhibits included water testing, simulated wastewater treatment system; a demonstration on how polluted water runoff affects our waterways; and a reenactment of the water cycle. Students also toured a mobile water quality lab and participated in recycling and water relays. Following the event, each student received environmental information handouts, activity books, pencils, and water bottles. They also walked away with a souvenir t-shirt and group photo with DC Water’s mascot, Wendy the Waterdrop.

Director of DC Parks and Recreation Jesus Aguirre commented, “The Water Drop Festival is a fun and engaging way to encourage our children to contemplate the importance of a great natural resource. The event displays that children are the future stewards of our water and they will take away lessons on how to utilize and conserve water for years to come.”

Latest News

Trench boxes at construction site for new pit accessing Potomac Interceptor Upstream

DC Water and its contractors continue to make progress constructing new access points to the Potomac Interceptor, one upstream of the damaged section, and an additional entry downstream to divert more wastewater flow from the pipe. These access points will allow crews to install a bulkhead, blocking flow in the pipe upstream of the collapsed area, keeping the site as dry as possible so crews can safely remove an extensive rock dam currently blocking the pipe.

Photo of giant rock and boulder removed

DC Water is releasing new findings regarding the environmental impacts following the January 19, collapse in a section of the Potomac Interceptor. Based on flow monitoring data collected before and after interim bypass pumping was activated, DC Water estimates approximately 243 million gallons of wastewater has overflowed from the collapse site.

Image of rock blockage taken by CCTV inside the Potomac Interceptor downstream of the collapse

Update on Extended Repairs, Safety Measures, and Water Quality Monitoring

Overnight CCTV inspection of the Potomac Interceptor revealed the blockage inside the collapsed sewer line is far more significant, showing a large rock dam stretching approximately 30 feet downstream of the original failure.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Map of lane closure
Traffic Advisory: Rock Creek and Potomac Parkway NW Lane Closure Beginning Jan 19

Beginning on or about January 19, 2026, weather permitting, DC Water will implement a temporary lane closure on Rock Creek and Potomac Parkway NW b

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
February 19, 2026
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.