EMERGENCY WATER OUTAGE
Mar 24, 2026 | 07:00 PM

EMERGENCY WATER OUTAGE
Mar 24, 2026 | 02:30 PM

DC Water Highlights Multiple Ways Residents & Businesses Rely on Water

October 10, 2018
Young students share how they value the city's drinking water.

District residents use about 100 gallons of water every day. Can you imagine your morning without freshly brewed coffee, a warm shower, or clean clothes? Hydration and hygiene aside—how would hospitals function without clean running water? How would firefighters address emergencies? From flushing toilets to running dialysis machines, water is critical to sustaining life as we know it.

“It’s important to reflect and recognize how water touches every part of our life,” says David L. Gadis, CEO and General Manager of DC Water. “Team Blue works hard to keep our water systems operating 24/7, so that clean, safe water can reach every home and business in the District.”

Today, DC Water visited different corners of the city to encourage students, elected officials and the public to think about the value of water in their daily lives as part of the “Imagine A Day Without Water” campaign. Plans include lessons, activities, trivia, and most importantly—great coffee and great beer:

  • Walk to School Day
    7:30AM-8:30AM
    Lincoln Park, East Capitol St NE, between 11th and 13th
    DC Water joined students and elected officials bright and early at “Walk to School Day” with a lesson about the importance of clean water and reliable infrastructure, resources often overlooked or unseen.
     
  • Imagine A Day Without Lunch
    12:00PM-2:00PM
    Corner of 7th and G St NW
    Team Blue and Compass Coffee were downtown to talk with residents about life’s most critical resource, and provide a much-needed mid-day caffeine boost.
     
  • Trivia Night at the Big Stick
    8:00PM-10:00PM
    20 M St SW
    DC Water has teamed up with District Trivia to host trivia at the Big Stick, where participants will compete in “Water is Life” rounds, and celebrate the best thing on tap.

 

###

Latest News

Placeholder DC Water Image

DC Water has completed sludge removal on a section of the C & O Canal between locks 13 and 14, which was used as a bypass to divert wastewater around the collapsed section of the Potomac Interceptor and back into the pipe further downstream. Crews are now constructing an access bridge to this section of the canal to allow soil removal to begin.

Overhead Photo of Potomac Interceptor

Comprehensive Survey to Guide Rehabilitation and Address Changing Site Conditions

Starting later this week, DC Water will conduct an aerial drone assessment along the 54-mile Potomac Interceptor (PI) to evaluate current site conditions and better understand the changing landscape and development along the Potomac Interceptor alignment, including areas where there may be rocks or boulders that need further on the ground inspections.

Photo of someone using the tap water with the dates of the annual water line cleaning March 23 - May 4

Spring cleaning isn’t just for closets and cabinets. DC Water’s system gets a refresh too!

Starting March 23, DC Water will begin work that helps maintain more than 1,300 miles of water lines across the District. During this time, the disinfectant used in drinking water will temporarily switch from chloramine to chlorine through May 4. This switch helps support overall water quality throughout the year.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Picture of new bike pedestrian path and traffic detour
New Path for Capital Crescent Trail Opens at Georgetown Waterfront Park

DC CLEAN RIVERS – POTOMAC RIVER TUNNEL PROJECT
If you bike, drive, or walk through Georgetown, we’ve got changes starting this week around the Potomac River Tunnel construction on Water Street NW. The Capital Crescent Trail has a new temporary detour through Georgetown Waterfront Park, open now for cyclists between 33rd and Potomac streets NW.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.