EMERGENCY WATER OUTAGE
Feb 08, 2026 | 01:00 AM

EMERGENCY WATER OUTAGE
Feb 07, 2026 | 11:00 PM

Emergency Water Outage
Feb 07, 2026 | 04:00 PM

DC Water Announces Fourth Annual Children’s Water Drop Festival

June 11, 2014

The District of Columbia Water and Sewer Authority (DC Water) is partnering with John Burroughs Education Campus, a Ward 5 STEM school, to co-host the agency’s fourth annual Children’s Water Drop Festival. At this free environmental education program, DC Water specialists will provide students with hands-on opportunities to learn about their water supply and environmental challenges. Each year, DC Water hosts the event to educate students on their water resources and increase awareness of the value of this vital life force.

WHAT: DC Water will offer a variety of interactive learning stations, exhibits and activities at the Children’s Water Drop Festival. Participating students will explore and learn about their watershed and ways to protect and preserve it.

WHEN: Due to inclement weather conditions, the event has been rescheduled for Thursday, June 19 from 1:00 – 2:30 p.m. (rain date)

WHERE: John Burroughs Education Campus,1820 Monroe Street, N.E., Washington, D.C. 20018

WHO: DC Water Community Outreach Team
DC Water’s mascot, Wendy the Waterdrop
Approximately 80 students

Latest News

Trench boxes at construction site for new pit accessing Potomac Interceptor Upstream

DC Water and its contractors continue to make progress constructing new access points to the Potomac Interceptor, one upstream of the damaged section, and an additional entry downstream to divert more wastewater flow from the pipe. These access points will allow crews to install a bulkhead, blocking flow in the pipe upstream of the collapsed area, keeping the site as dry as possible so crews can safely remove an extensive rock dam currently blocking the pipe.

Photo of giant rock and boulder removed

DC Water is releasing new findings regarding the environmental impacts following the January 19, collapse in a section of the Potomac Interceptor. Based on flow monitoring data collected before and after interim bypass pumping was activated, DC Water estimates approximately 243 million gallons of wastewater has overflowed from the collapse site.

Image of rock blockage taken by CCTV inside the Potomac Interceptor downstream of the collapse

Update on Extended Repairs, Safety Measures, and Water Quality Monitoring

Overnight CCTV inspection of the Potomac Interceptor revealed the blockage inside the collapsed sewer line is far more significant, showing a large rock dam stretching approximately 30 feet downstream of the original failure.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Picture of new bike pedestrian path and traffic detour
New Path for Capital Crescent Trail Opens at Georgetown Waterfront Park

DC CLEAN RIVERS – POTOMAC RIVER TUNNEL PROJECT
If you bike, drive, or walk through Georgetown, we’ve got changes starting this week around the Potomac River Tunnel construction on Water Street NW. The Capital Crescent Trail has a new temporary detour through Georgetown Waterfront Park, open now for cyclists between 33rd and Potomac streets NW.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
February 19, 2026
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.