Design and Construction Standards

LINEAR CAD MANUAL 2023

The Linear CAD Manual and it's appendices are now available by clicking the links on this page. 

The Linear CAD Manual (LCM) is the primary computer-aided design (CAD) reference for preparing linear design Drawings in the Capital Improvement Program (CIP) of the District of Columbia Water and Sewer Authority (DC Water). The LCM is referenced as required criteria in the Standard Scope of Work Exhibits of the DC Water Professional Services Agreement. The LCM presents CAD Standards to be used to produce all Design Drawings and Record Drawings for linear infrastructure that are produced by DC Water and its consultants.

If you are working on projects for DC Water, contact Kyle Tyler at kyle.tyler@dcwater.com or Calwood.Somers@dcwater.com to obtain pre-approved CAD templates for design drawings.

For more information regarding other standards, contact Bethel Abate at bethel.abate@dcwater.com

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

The Capital Crescent Trail will shift north and remain open to pedestrians and cyclists.
Capital Crescent Trail Pattern Change

DC Water will initiate the next phase of construction at the Capital Crescent Trail site near the Aqueduct by opening a temporary trail around the

Latest Blog Post
DC Water General Manager and CEO David Gadis recognizes Lily MacDonald during the May Board of Directors meeting.
From Classroom to Community: A Student Spotlight on DC Water's SPLASH Program
A speechwriting assignment became a call to action for water access and affordability through DC Water's SPLASH program.
Upcoming Meeting

Upcoming Events

May 13
May 16
2:00 pm - 6:00 pm
May 20

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.