Poplar Point Pumping Station Project

Poplar Point Rendering

Overview

Construction was completed on the 55 million gallons per day Poplar Point Pumping Station (PP-PS), which is situated between South Capitol Street, Suitland Parkway and the Anacostia Freeway in southeast DC. The new Pumping Staton replaced the original Poplar Point Pumping Station which served the District beginning in 1915. The PP-PS handles sewage flows from much of southeast DC. Sewage flows by gravity to the PP-PS through the existing Anacostia Main Interceptor, where it will be "lifted" and discharged into the major sewers that deliver flow to Blue Plains Advanced Wastewater Treatment Plant. The PP-PS incorporates green design elements such as photovoltaic solar panels, an extensive green roof and green infrastructure incorporated into the landscape.

Scope of Work

  • Construction of a new 55 million gallon per day sewage pumping station
  • Construction of a new Anacostia Main Interceptor Diversion Sewer to convey flow to the pumping station
  • Construction of a new Barry Road Diversion Sewer to convey flow from the Barry Road area to the pumping station
  • Installation of a chamber to deliver sewage to the main sewers that connect to Blue Plains


Partners

DC Water worked closely with multiple stakeholders to provide timely information about the project, to solicit input, and to ease the burdens of construction. These stakeholders included residents, other utility service providers, District Department of Transportation, District Office of the Deputy Mayor for Planning and Economic Development and the Commission of Fine Arts. DC Water also coordinated with Advisory Neighborhood Commissions to provide regular updates.

Project Location Map

 

Contact Information

Senior Public Outreach Officer: Hadiah Jordan (202) 787-4717

Email: dccleanrivers@dcwater.com

 

clean river
Clean Rivers

The Clean Rivers Project is DC Water's ongoing program to reduce combined sewer overflows into the District's waterways - the Anacostia and Potomac Rivers and Rock Creek. The Project is a massive infrastructure and support program designed to capture and clean water during heavy rainfalls before it ever reaches our rivers.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Close-up of the TBM cutterhead suspended by a crane
From Germany to DC, Emily Arrives on a One-Way Ticket to Help Build the Potomac River Tunnel

DC Water’s Newest Tunnel Boring Machine to Dig Tunnel’s Southern Segment

Emily, DC Water’s second tunnel boring machine for the Potomac River Tunnel Project, has arrived at the West Potomac Park construction site. Once assembled and launched, she will excavate the tunnel’s southern section.

Latest Blog Post
DC Water General Manager and CEO David Gadis recognizes Lily MacDonald during the May Board of Directors meeting.
From Classroom to Community: A Student Spotlight on DC Water's SPLASH Program
A speechwriting assignment became a call to action for water access and affordability through DC Water's SPLASH program.
Upcoming Meeting
Date
June 4, 2026
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.