FIELD INVESTIGATIONS, SURVEYS, AND INSPECTIONS NOTICE OF SANITARY SEWER FIELD WORK (National Park Service – Dumbarton Oaks Park)

Sewer Investigation

DC Water's Contractors will be conducting field investigations, surveys, and routine inspections of the sanitary sewer and manholes in this park. These efforts will help to identify existing site conditions and environmental resources to support analyses, permitting, and design for future maintenance-related activities for the sanitary sewer system in this area. General site walks and observations will be performed throughout the park. Additionally, the following activities generally will be performed within 100 feet of sewer infrastructure; however, they may extend beyond 100 feet as necessary.

  • Tree survey
  • Manhole inspections
  • Threatened and endangered species habitat identification
  • Topographic survey
  • Non-intrusive utility designations
  • Reconnaissance of stream reaches
  • Stream assessment and survey
  • Profile and measurement surveys
  • Observations for bank erodibility
  • Manhole excavations to locate buried manhole

Please see schedule, potential traffic impacts, and other important information below:

SCHEDULE 

  • Estimated start: November 2024
  • Estimated completion: Spring 2027
  • Normal work hours: 8:00 a.m. – 5:00 p.m., Monday through Friday  

IMPORTANT INFORMATION 

  • The activities will not involve any mechanized equipment.
  • All activities will be performed in accordance with conditions with the exception of authorization from NPS to perform some activities beyond 100 feet of sewer infrastructure as necessary.
  • Streambed material sampled on site will be returned in place.
  • All equipment is portable and will be removed from the site daily.
  • The activities will not significantly impact traffic in the area.

We apologize for any inconvenience and thank you in advance for your cooperation. 

Contact Information

FOR MORE INFORMATION, PLEASE CONTACT

DC Water Project Email
csrb@dcwater.com

DC Water Project Manager
Peter Kelley 
(202) 787-2540 
peter.kelley@dcwater.com

DC Water Project Liaison
Joyous Willis 
(202) 787-4065 
joyous.willis@dcwater.com

DC Water Standard Contacts
Water Quality and Technology Division
(202) 612-3440 

24-hr Emergency/Command Center
(202) 612-3400

Office of Marketing and Communications
(202) 787-2200

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Last gantry at the bottom of the shaft where crews connect it
Now Fully Assembled, It’s Full Speed Ahead for the tunnel boring machine Mary and the Potomac River Tunnel

Final Gantry Completes Mobile Support Train Behind Mary Stretching More Than 700 Feet

DC Water’s tunnel boring machine Mary may be the muscle behind the Potomac River Tunnel Project, but the gantries that trail behind her form the heart, brains, and guts of the operation. Now crews have lowered and connected the final gantry section, giving Mary the tools and equipment she needs to continue tunneling north.

Latest Blog Post
Emergency supplies arranged on a table, including bottled water, canned food, a backpack, first aid kit, flashlight, phone, medication and other essential items.
Simple Ways to Stay Prepared at Home
A few simple steps can help your household prepare for severe weather and temporary water or sewer service interruptions.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.