EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Cleaner Waterways Start With Everyday Choices

Plastic bottles, cups and other floating debris on the surface of the Anacostia River before the Anacostia River Tunnel began operating.
July 21, 2026

Plastic Free July starts with one small change.

Refill, don't toss. Bring a reusable bag. Bring your own coffee cup. Skip single-use utensils. Dispose of trash properly. Cleaner habits. Cleaner rivers.

Those individual actions may seem small, but they add up.

Every bottle recycled, reusable bag carried, and piece of litter properly disposed of helps reduce the amount of plastic that can end up in our waterways. Plastic pollution often reaches rivers through storm drains, which carry rainwater and anything it collects from streets and sidewalks. Even products marketed as "flushable," such as some wet wipes, contain synthetic materials, including plastics, that can create problems in our sewer system.

While personal choices make a difference, protecting our waterways also requires investments in infrastructure working behind the scenes.

The Potomac River Tunnel is one of those investments. The tunnel is designed to capture and convey excess wastewater during heavy rainstorms to the Blue Plains Advanced Wastewater Treatment Plant for treatment, helping prevent combined sewer overflows from reaching the Potomac River.

The impact of DC Water's Clean Rivers Project is already being felt. Since 2008, the program has prevented more than 21.68 billion gallons of combined sewage and stormwater and more than 12,800 tons of trash and debris from entering the Anacostia River. When completed, the Potomac River Tunnel is expected to reduce overflows to the Potomac River by approximately 93% and prevent an estimated 654 million gallons of polluted water from reaching the river each year.

Protecting the Potomac River doesn't happen through one solution alone. It takes everyday environmental stewardship, innovative engineering, and long-term investments in critical infrastructure. While residents help keep plastic and litter out of our waterways through daily choices, projects like the Potomac River Tunnel will capture waste before it reaches the river. Together, these efforts are helping create cleaner waterways for future generations.

Latest Posts

Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
Nov 18, 2026
How Teamwork Helped DC Water Stop Hidden Water Loss
Emergency supplies arranged on a table, including bottled water, canned food, a backpack, first aid kit, flashlight, phone, medication and other essential items.
Aug 21, 2026
A few simple steps can help your household prepare for severe weather and temporary water or sewer service interruptions.
Plastic bottles, cups and other floating debris on the surface of the Anacostia River before the Anacostia River Tunnel began operating.
Jul 21, 2026
Protecting our waterways starts with everyday actions and continues through critical infrastructure designed to keep pollution out of our rivers.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.