TRAFFIC ADVISORY: Lane Closures for Valve Replacement on Key Bridge

October 09, 2026

WASHINGTON, D.C. – DC Water will replace a defective valve on a 30-inch water main on the outbound side of the Key Bridge tonight. The work will take place between 10 pm Friday night and 6 am Saturday morning and will require lane closures that could impact traffic.

Traffic will be reduced to a single lane on the outbound side of the Key Bridge, the westbound lanes of the Whitehurst Freeway, and westbound M Street, between 32nd Street and the Whitehurst Freeway.

Traffic control measures will be in place to guide motorists safely through the area. Drivers, cyclists, and pedestrians are urged to use caution and follow posted signs and directions from the traffic control personnel.

The valve replacement is part of an ongoing project to assess the condition of water mains in Georgetown. Another valve replacement on a 48-inch water main will be scheduled later this month.

WHEN AND WHAT TO EXPECT:

  • Date: Friday, October 9 and Saturday, October 10
  • Duration: Approximately 8 hours
  • Time: During overnight off-peak hours 10 pm - 6 am 
  • Location: Outbound Key Bridge at M Street NW in Georgetown

TRAFFIC IMPACTS:

  • M Street NW – Westbound traffic reduced to one lane between 32nd Street and the Whitehurst Freeway
  • Key Bridge – Traffic outbound towards Virginia reduced to one lane
  • Whitehurst Freeway – Westbound traffic towards Georgetown reduced to one lane

###

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
November 19, 2026
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.