EMERGENCY WATER OUTAGE
Dec 17, 2025 | 06:18 PM

EMERGENCY WATER OUTAGE
Dec 17, 2025 | 05:52 PM

EMERGENCY WATER OUTAGE
Dec 17, 2025 | 02:00 PM

TRAFFIC ADVISORY: DC Water emergency work to close one lane of Suitland Pkwy SE in each direction overnight

April 30, 2025
Map of emergency lane closure sutiland parkway se near Stanton Rd
Contractor to perform inspections in area of 54-inch sewer main failure 

DC Water in coordination with the District Department of Transportation will perform emergency work on Suitland Parkway Southeast near Stanton Road starting tonight as early as 7 p.m. and ending tomorrow morning at 5 a.m. Crews will be inspecting additional sections of a 54-inch stormwater main that failed last month.

In order to conduct the work, traffic in this area will be reduced from two lanes to one in each direction on Suitland Parkway. Motorists are advised to use caution, reduce speeds, and follow the direction of flaggers through the construction zone. 

Repairs have been ongoing since the stormwater main failed in early March; however, further inspections are needed to determine if other sections of the pipe are compromised. The break last month created a sinkhole 15-feet wide and 20 feet deep on Suitland Parkway between Firth Sterling Avenue and Stanton Road. 

Work is expected to be completed, and the lane closures lifted prior to the start of the morning rush hour Thursday morning. 

For additional questions or concerns call our 24/7 Emergency Command Center at 202-612-3400.
 

Latest News

Worker on side of steep slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Image of Wendy with EPA Letter

DC Water is reaching out to nearly 25,000 customers this month with important information about the material of their water service lines. These annual notifications are part of DC Water’s ongoing commitment to prevent exposure to lead and remove lead service lines from the District’s drinking water system through the Lead Free DC initiative.

Placeholder DC Water Image

Following the completion of priority valve repairs, DC Water will be doing road restoration work along New York Ave and Bladensburg Rd NE this weekend. The work will require lane closures for the duration of the weekend, reduce capacity, and may cause a significant impact to traffic.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Worker on side of steep slope
Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
December 18, 2025
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.