TRAFFIC ADVISORY: DC Water emergency work to close one lane of Suitland Pkwy SE in each direction overnight

April 30, 2025
Map of emergency lane closure sutiland parkway se near Stanton Rd

Contractor to perform inspections in area of 54-inch sewer main failure 

DC Water in coordination with the District Department of Transportation will perform emergency work on Suitland Parkway Southeast near Stanton Road starting tonight as early as 7 p.m. and ending tomorrow morning at 5 a.m. Crews will be inspecting additional sections of a 54-inch stormwater main that failed last month.

In order to conduct the work, traffic in this area will be reduced from two lanes to one in each direction on Suitland Parkway. Motorists are advised to use caution, reduce speeds, and follow the direction of flaggers through the construction zone. 

Repairs have been ongoing since the stormwater main failed in early March; however, further inspections are needed to determine if other sections of the pipe are compromised. The break last month created a sinkhole 15-feet wide and 20 feet deep on Suitland Parkway between Firth Sterling Avenue and Stanton Road. 

Work is expected to be completed, and the lane closures lifted prior to the start of the morning rush hour Thursday morning. 

For additional questions or concerns call our 24/7 Emergency Command Center at 202-612-3400.
 

Latest News

Photo of completed repair with concrete encasing the sewr pipe

DC Water has successfully completed emergency repairs on a critical section of the Anacostia Force Main following a failure near Anacostia Avenue and Ponds Street Northeast in July. With repairs finalized, attention now turns to rehabilitating other vulnerable segments of the 6.25-mile pipeline to ensure long-term reliability and resilience. 

Map of construction area on Clara Barton Parkway near I495

DC Water will be doing construction as part of a sanitary sewer rehabilitation project on Clara Barton Parkway in Maryland from Sept 8 - Oct 10, 2025, which may cause delays inbound near the I-495 Beltway interchange. One lane will be closed in the work zone to reline an 800-foot section of the sewer line, known as the Potomac Inteceptor. Access to the inner and outer loops of the Beltway will remain available.

Rock Creek Trail Site for Potomac River Tunnel Project

Starting the week of August 25, DC Water will take another big step forward in the Potomac River Tunnel Project. Ground stabilization will begin at the Rock Creek Trail site, near the Watergate Complex, to drill secant piles that will form a retaining wall for the drop shaft.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Rock Creek Trail Site for Potomac River Tunnel Project
Ground Stabilization Work Begins Near Watergate Complex, starting Aug 25

Starting the week of August 25, DC Water will take another big step forward in the Potomac River Tunnel Project. Ground stabilization will begin at the Rock Creek Trail site, near the Watergate Complex, to drill secant piles that will form a retaining wall for the drop shaft.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
September 18, 2025
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.