WHAT'S NEW
UPDATE: Pumps are in Place and DC Water is Reinforcing Receiving Section of Potomac Interceptor to Complete Bypass
DC Water Expects to Start Turning on Bypass Pumps on Monday.
Read More
WHAT'S NEW
DC Water Working to Install Bypass Pumps, as Progress Continues to Contain Sewer Overflow
Additional work completed to remove upper lock gates on C & O Canal locks.
Read More
WHAT'S NEW
DC Water Advancing Work on Bypass to Contain Sewer Overflow
Partial Bypass Expected to Begin as Early as This Weekend
DC Water and its contractor continue to make progress to contain the sewer overflow from a collapsed section of the Potomac Interceptor (PI), a major sewer line along Clara Barton Parkway near 495 in Montgomery County, MD. As part of that work, crews today are mobilizing equipment, clearing brush and debris, and installing pipes in preparation to bypass the flow around the damaged section of sewer line.
Read More
LATEST NEWS
NEWS & UPDATES

362 Likes
Connect With Us
Social Media gives us the opportunity to engage in real time with you. Check us out on whichever platform you prefer, including Facebook, Instagram, X (formerly Twitter), LinkedIn and YouTube.
Post
dc.water
16 hrs
Like
Comment
Share
Connect With Us
Social Media gives us the opportunity to engage in real time with you. Check us out on whichever platform you prefer, including Facebook, Instagram, X (formerly Twitter), LinkedIn and YouTube.
CONTACT US
Let’s talk about
Love to hear from you.
Our Location
1385 Canal Street SE, Washington, DC 20003


