Tunnel Dewatering Pump Station and Enhanced Clarification Facility

Tunnel Dewatering Pump Station
Project Completion
100%

Two key components of DC Water’s Nitrogen Removal/Wet-Weather Program include the Tunnel Dewatering Pump Station (TDPS) and Enhanced Clarification Facility (ECF).

This project starts where the massive DC Clean Rivers Project tunnels end at Blue Plains. In 2018, when the Blue Plains Tunnel was brought online, the Tunnel Dewatering Pump Station (TDPS) and Enhanced Clarification Facility (ECF) began accepting the millions of gallons of combined sewage that previously flowed into the District's waterways during heavy rainstorms. That flow now receives treatment.

Principal components include:

■    Complete treatment for a rate of up to 555 million gallons per day (mgd) for the first four hours during a wet weather event, and 511 mgd thereafter.
■    A 225 mgd ECF, constructed to treat captured wet-weather flows from the tunnel in addition to providing a higher level of treatment.
■    A new Tunnel Dewatering Pump Station equal to the capacity of the ECF with sufficient capacity to dewater the tunnel system.

The TDPS pumps the collected combined sewer overflows (CSOs) from the Blue Plains tunnel to the ECF for treatment. The ECF process consists of fine screening, grit removal, and a ballasted flocculation process, followed by disinfection and dechlorination prior to discharge to the Potomac River or to secondary treatment.

Notice to Proceed was issued in August 2014 and the project was completed in 2018.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.