Filtrate Treatment Facilities

Filtrate Treatment Facilities
Project Completion
94%

For decades, DC Water has been a pacesetter in restoring the Potomac River and Chesapeake Bay by improving the performance and treatment capabilities of the Blue Plains Advanced Wastewater Treatment Plant. The facility has successfully achieved nitrogen removal since 1999, and has exceeded the Chesapeake Bay Agreement goal of removing 40 percent of the total nitrogen (TN) in the effluent from the plant.

As part of a continuing effort to improve water quality, DC Water is designing facilities to reduce nitrogen discharges even further – to the limit of conventional treatment technology. These facilities, known as the enhanced nitrogen removal facilities (ENRF), are being constructed as part of our $3.8-billion, ten-year Capital Improvement Program (CIP).

The Filtrate Treatment Facilities (FTF) are part of this effort. This novel anammox-based side stream treatment process, called DEMON®, will be the largest of its kind in the world when the facility is commissioned. The DEMON® process represents a major breakthrough in nitrogen removal because it does not require the addition of methanol, uses 60 percent less energy than mainstream treatment and has the lowest greenhouse gas emissions of all the processes considered for this project. It could save DC Water more than $8 million a year in methanol and energy costs.

Long-term benefits include: 
■    Lowest demonstrated energy demand of any biological treatment process. 
■    No methanol or other supplemental carbon requirement. 
■    Lowest greenhouse gas emissions.

The construction cost of this project is approximately $64 million.  Notice-to-Proceed was given to the contractor in March 2014, and the facility is expected to be online in 2017. 

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.