EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC Water's

News & Updates

At DC Water, we understand the importance of keeping our community informed about our services, projects, and achievements. Our news web page serves as a reliable source for the latest information on a range of topics.

contract for construction of the Potomac River Tunnel (PRT)
11 July, 2011

Repair Work Will Take Place Between Brandywine Street and Ridge Road

contract for construction of the Potomac River Tunnel (PRT)
21 June, 2011

2010 Drinking Water Quality Report Published

contract for construction of the Potomac River Tunnel (PRT)
1 June, 2011

TapIt network of refillable water bottle locations spans 22 states and DC

contract for construction of the Potomac River Tunnel (PRT)
23 May, 2011

Residents urged to find other ways to beat the heat as temperatures rise

contract for construction of the Potomac River Tunnel (PRT)
17 May, 2011

Mayor Gray, Dignitaries, Usher in New Era of Technology: One project turns waste into power; the other reduces nitrogen to protect Chesapeake Bay

contract for construction of the Potomac River Tunnel (PRT)
9 May, 2011

do not send

contract for construction of the Potomac River Tunnel (PRT)
4 May, 2011

One of two new Chevy Volts assigned to General Manager

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.