EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC Water's

News & Updates

At DC Water, we understand the importance of keeping our community informed about our services, projects, and achievements. Our news web page serves as a reliable source for the latest information on a range of topics.

Excavation of water main break
19 May, 2025

Closure between Morris Rd and Suitland Pkwy, motorists encouraged to avoid area

DC Water crews are on scene of a water main break that occurred early this morning on Martin Luther King Jr. Avenue Southeast. Water from the main flooded the street and caused significant damage to the roadway, closing the street between Morris Road and Suitland Parkway.

Road closed sign
19 May, 2025

DC Water is wrapping up repairs on a broken 8-inch water main on Martin Luther King Jr. Ave Southeast; however, motorists are advised to continue to steer clear of the road. It’s expected to remain closed between Howard Rd and Talbert Street through Tuesday and possibly longer.

Map showing lane closure from Ohio  Drive to I-66 ramp
13 May, 2025

Beginning on or about May 13, 2025, DC Water will temporarily close one lane of the ramp from Ohio Drive Southwest to I-66. Crews will be working to locate and mark underground utilities in the park area west of the Lincoln Memorial as part of the Potomac River Tunnel Project. The lane closure will occur after the morning rush hour and reopen before the evening rush hour begins.

Water Street Potomac River Tunnel Traffic Advisory
5 May, 2025

DC CLEAN RIVERS – POTOMAC RIVER TUNNEL PROJECT

DC Water is advising the public of construction impacts starting on or about the week of May 12, 2025, in the 3500 block of Water Street Northwest near the Capital Crescent Trail, weather permitting. Temporary traffic lane closures, trail detours, and parking restrictions will be in effect.

Map of area on K and 30th St where utility investigation will occur
2 May, 2025

DC CLEAN RIVERS – POTOMAC RIVER TUNNEL PROJECT

Beginning on or about May 8, 2025, DC Water will begin work to locate and mark underground utilities on K Street Northwest between 29th and 30th streets Northwest. The work, which involves drilling small holes, will require temporary lane and parking closures and parking restrictions.  

Images showing the crack in the crown of the red brick sewer.
2 May, 2025

DC Water is preparing for emergency repairs on a large sewer line next to Rock Creek, after discovering significant structural issues. The six-foot pipeline, known as the Rock Creek Main Interceptor, carries as much as 100 million gallons of wastewater a day and could cause significant environmental harm if a failure occurred.

DC Water Potomac River Tunnel Project construction site at West Potomac Park
1 May, 2025

As part of the excavation work for DC Water’s Potomac River Tunnel Project, weekly controlled underground blasting operations at the West Potomac Park construction site will begin as early as next week and continue through February 2026. The site is located along the Potomac River at Ohio Drive and Independence Avenue Southwest.

Map of emergency lane closure sutiland parkway se near Stanton Rd
30 April, 2025

Contractor to perform inspections in area of 54-inch sewer main failure

DC Water in coordination with the District Department of Transportation will perform emergency work on Suitland Parkway Southeast near Stanton Road starting tonight as early as 7 p.m. and ending tomorrow morning at 5 a.m. Crews will be inspecting additional sections of a 54-inch stormwater main that failed last month.

Tunnel Boring Machine named Mary undergoing Factory Acceptance Testing
28 April, 2025

Her name is Mary and she’s a tunnel boring machine (TBM) capable of cutting through hard rock and boring a tunnel 21 feet in width. This month, she completed factory acceptance testing in Germany and will head across the pond to DC to start work on the Potomac River Tunnel.

Head shot of Rabia Chaudhry Director of  Water Supply Resilience
21 April, 2025

DC Water’s efforts to build a more resilient water supply took a significant step forward with the announcement today of Rabia Chaudhry, PhD, PE, as the first Director of Water Supply Resilience. The new position reflects the importance and urgency surrounding the Authority’s reliance on the Potomac River as its only water source and the need for alternatives.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.