EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

December 12, 2025
Worker on side of steep slope
TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT
 

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, crews will begin the last phase of work, which includes spraying a protective layer of grass seed, mulch, and nutrients onto the slope—a process called hydroseeding—to help vegetation grow and keep the hillside strong.

During this work, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays. This will also allow crews to clear away leftover debris at the bottom of the slope and prepare to reopen the sidewalk for pedestrians and cyclists. Once this work is finished, DC Water can begin mobilization for tunnel construction at the site.

The slope stabilization work began in September and is expected to be completed in January, weather permitting. The project required removing trees and loose materials, drilling approximately 725 steel dowels into the slope, and installing mesh to hold everything in place. In collaboration with the community, construction was done in phases to ensure safety and minimize traffic impacts.

INFORMATION

Where: Canal Road NW between Foxhall Road NW (Near the Glover Archbold Trailhead) and the Georgetown University entrance
What: One westbound lane closed to traffic; sidewalk closed on north side
Date: Monday, December 15, 2025 - early January 2026, weather permitting
Time: Weekdays 10:15 a.m. to 3 p.m.
Saturdays from 7 a.m. to 7 p.m.  

PEDESTRIAN/CYCLIST ALTERNATIVES

Detours: via Reservoir Road, C&O Canal Towpath, Capital Crescent Trail, and Glover-Archbold Trail 
ADA-accessible shuttle: available at designated stops:

  • Canal Road near the Georgetown University (GU) entrance
  • Foxhall Road NW near the intersection with 44th Street NW
  • Call (703) 919-7430 for pick up

The slope stabilization supports the Potomac River Tunnel Project, an $819 million, 5.5-mile-long tunnel that will significantly reduce the amount of untreated sewage and stormwater entering the Potomac River. The Project is included in DC Water’s Capital Improvement Program, which invests in infrastructure to protect public health, improve water quality, and enhance service reliability across the District.

For more information 
Visit dcwater.com/slope or call (202) 787-4400

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.