Fall Leaves and Low Water in Potomac River May Affect Tap Water Taste and Odor

November 28, 2007

The District of Columbia Water and Sewer Authority (WASA) has received several recent complaints about the taste and odor of tap water. Water quality officials say this is a temporary, non-health threatening issue likely due to the deterioration of fall leaves and the low water levels in the Potomac River, the Districts drinking water source.

WASA purchases drinking water from the U.S. Army Corps of Engineers Washington Aqueduct and distributes it throughout the District of Columbia.

"The degradation, or breakdown, of the acid in the leaves produces an earthy odor," explains Aqueduct General Manager Thomas Jacobus. "This years water levels have been very low, without a lot of rain and fresh water to push along the decaying leaves."

A few heavy rainstorms, Jacobus says, should solve the problem. In the meantime, the Aqueduct is adding activated carbon to its treatment process to absorb the odor.

"This is an aesthetic issue and an important one, but not a health problem," Jacobus says. "The Aqueduct and our customers at WASA and in Arlington and Falls Church will continue to carefully monitor the water quality so we can make any adjustments necessary to assure that the taste and odor issues are resolved."

Water quality concerns may be addressed by calling the Washington Aqueduct at 202-764-0019 or WASA at 202-612-3400.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.