District Drinking Water Supplier Changes Water Chemistry

March 23, 2007

For one month, April 7, 2007 through May 7, 2007, citizens in the District of Columbia may notice a slight chlorine taste and odor in their drinking water due to a temporary change in the disinfectant that is added at the water treatment plant. The Washington Aqueduct, a division of the U.S. Army Corps of Engineers, who treats the water, will switch the disinfectant from chloramines to chlorine during this one-month period.

The temporary change in water chemistry does not affect drinking water safety. Users who take special precautions to remove chlorine from tap water such as dialysis centers, medical facilities or aquatic pet owners should take note of this temporary addition of chlorine in the water treatment process and act accordingly.

•If you are a home user of a kidney dialysis machine, contact your dialysis center in order to make any modifications to your dialysis machine.

•If you own aquatic pets, you may want to contact a pet supply store to ensure proper usage of dechlorination chemicals.

The periodic disinfectant change is an industry-wide practice to keep water mains clean and free of harmful bacteria. This process along with WASA’s vigorous flushing program helps loosen sediments that may accumulate in the distribution system.

Customers may notice a slight temporary discoloration of the water. Simply run the faucet until the water turns clear. In the unlikely event your water is discolored and remains cloudy please contact our Water Quality Division at (202) 612-3440 Mon.-Fri., 8 am – 4:30 pm or (202) 612-3400, 24 hours a day for assistance

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.