Emergency Water Outage
May 29, 2026 | 05:00 PM

EMERGENCY WATER OUTAGE
May 29, 2026 | 12:00 PM

U.S. EPA, DC Water, the Embassy of Japan and DOEE celebrate a cleaner Anacostia River on Earth Day

April 22, 2019
Photo from Earth Day Event

This Earth Day, U.S. EPA, DC Water, the Embassy of Japan, District Department of the Environment (DOEE) and others assembled on the Anacostia River to celebrate the success of the Clean Rivers Project. On this pristine afternoon, DC Water’s skimmer boats demonstrated how they collect hundreds of tons of trash and floatable debris every year. Additionally, attendees celebrated the success of the lower Anacostia River Tunnel-- which after one year in service has prevented more than 5 billion gallons of sewage, and 1,100 tons of trash, solids and debris, from entering the Anacostia.
 
About one-third of the District, like hundreds of older cities, is served by a 100-plus-year-old combined sewer system that carries both stormwater and sewage in one pipe. In dry weather, this civil engineering approach works smoothly; however, during rainstorms the increased volume overwhelms the system and, rather than back up onto streets and in homes, is designed to overflow to the nearest waterway, carrying trash and debris with it.
 
“We inherited a number of legacy challenges and have developed unique solutions to address these issues head-on,” said Biju George, DC Water Executive Vice President, Operations and Engineering. “The Clean Rivers Project includes the tunnel system and skimmer boats, working in tandem for a healthier river and a vibrant waterfront.”
 
The massive $2.7 billion ratepayer-funded investment put DC Water on target to meet one of the highest combined sewer overflow (CSO) capture rates in the nation. “It is the largest project we’ve ever done and is easily the largest public works project happening in our nation’s capital today,” added George. Once complete, the Clean Rivers Project will reduce combined sewer overflow to the Anacostia by 98 percent and 96 percent for all three of the District’s waterways. The portion that is already in service was expected to reduce CSOs by approximately 80 percent in an average rainfall year, yet it has exceeded projections and is performing around 90 percent.
 
Now, instead of flowing into the Anacostia, the combined stormwater and sewage is captured and conveyed to the Blue Plains Advanced Wastewater Treatment Plant for treatment prior to discharge to the Potomac River.
 
Commenting on today’s celebration, Andrew Wheeler, U.S. Environmental Protection Agency Administrator, said, “Since the first Earth Day in 1970, America has made tremendous progress improving air quality, cleaning up contaminated lands, and ensuring our bodies of water are safe for recreation and commerce. We are continuing that progress and working hard to ensure all Americans have a clean, healthy environment and a more prosperous future. Today, we were delighted to join with Japanese Ambassador Sugiyama to see firsthand the work DC Water is doing to address marine litter.”

Japan’s Ambassador Shunsuke Sugiyama echoed the importance of keeping water bodies free of marine litter. “Japan and the U.S. already cooperate globally on the environment,” he said. “And I look forward to further cooperation in the years ahead.”

For more information on the Clean Rivers Project, a $2.7 billion plan for healthier District waterways, please visit: www.dcwater.com/cleanrivers.

Latest News

Close-up of the TBM cutterhead suspended by a crane

DC Water’s Newest Tunnel Boring Machine to Dig Tunnel’s Southern Segment

Emily, DC Water’s second tunnel boring machine for the Potomac River Tunnel Project, has arrived at the West Potomac Park construction site. Once assembled and launched, she will excavate the tunnel’s southern section.

Information for the DC Water Town Hall on a graphic

DC Water is reminding community members that it will host a Town Hall on Thursday, May 28, from 7–9 p.m. at DC Water Headquarters to discuss proposed Fiscal Year 2027 budget updates and rate ...

Graphic with information about the town hall

DC Water’s proposed $1.9 billion operating and capital budget for Fiscal Year 2027, focused on Smart Spending for a Resilient Tomorrow, includes funding to help provide safe, reliable drinking water, upgrade aging water and sewer infrastructure, reduce pollution in local waterways, and continue removing lead service lines across the District.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Close-up of the TBM cutterhead suspended by a crane
From Germany to DC, Emily Arrives on a One-Way Ticket to Help Build the Potomac River Tunnel

DC Water’s Newest Tunnel Boring Machine to Dig Tunnel’s Southern Segment

Emily, DC Water’s second tunnel boring machine for the Potomac River Tunnel Project, has arrived at the West Potomac Park construction site. Once assembled and launched, she will excavate the tunnel’s southern section.

Latest Blog Post
DC Water General Manager and CEO David Gadis recognizes Lily MacDonald during the May Board of Directors meeting.
From Classroom to Community: A Student Spotlight on DC Water's SPLASH Program
A speechwriting assignment became a call to action for water access and affordability through DC Water's SPLASH program.
Upcoming Meeting
Date
June 4, 2026
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.