TRAFFIC ADVISORY: Suitland Parkway Stormwater Main & Sinkhole Repair

March 05, 2025
Sinkhole, one outbound lane of Suitland Parkway between Firth Sterling Ave and Stanton Rd SE is closed.

DC Water is investigating a sinkhole involving the failure of a 54-inch stormwater main on Suitland Parkway in Southeast DC. For safety reasons, one outbound lane of Suitland Parkway between Firth Sterling Ave and Stanton Rd SE is closed. Inbound traffic on Suitland Parkway is unaffected. Drivers may want to consider alternate routes.

DC Water teams are on scene, however, the large volume of stormwater in the system caused by the rain is preventing us from beginning the investigation into the cause and make repairs. The sinkhole measures six feet deep and 10 feet long and may be at risk of further erosion.

Traffic impacts are expected to continue for at least 24 hours and may be extended based on the repairs needed. This could include excavation and replacement of a large section of the 54-inch pipe.

Additional updates will be provided as available through social media on X @DCWater and on dcwater.com or call our 24/7 Emergency Command Center at 202-612-3400.

Latest News

Placeholder DC Water Image

DC Water will replace a defective valve on a 30-inch water main on the outbound side of the Key Bridge tonight, Friday, October 9, 2026.

Photo of Potomac River in Montgomery County MD

Expanded testing by DC Water found that the Potomac River is healthy and that there is no evidence of lasting harm to the river from January's collapse of the Potomac Interceptor sewer line.

Placeholder DC Water Image

Traffic will be reduced to a single lane on outbound Key Bridge, Whitehurst Freeway and M Street NW.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Christening of TBM Emily with DC Water Interim General Manager Matt Brown holding bottle of tap water to christen Emily
DC Water Welcomes the Community Underground to See the Potomac River Tunnel and Christens Tunnel Boring Machine Emily

DC Water celebrated the christening of Emily today. It’s the second giant tunnel boring machine (TBM) that will help build the 5.5-mile Potomac River Tunnel. The celebration continued with Community Day. Residents and families met Emily and stepped inside the tunnel where she will soon begin digging.

Latest Blog Post
Emergency supplies arranged on a table, including bottled water, canned food, a backpack, first aid kit, flashlight, phone, medication and other essential items.
Simple Ways to Stay Prepared at Home
A few simple steps can help your household prepare for severe weather and temporary water or sewer service interruptions.
Upcoming Meeting
Date
October 14, 2026
Wednesday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.