EMERGENCY WATER MAIN BREAK
Jul 25, 2026 | 08:40 PM

EMERGENCY WATER MAIN BREAK
Jul 25, 2026 | 04:44 PM

Tips for Homeowners and Indoor Frozen Pipes

January 27, 2003

During periods of very cold weather, we receive many calls from homeowners seeking advice about what to do when their pipes freeze in their homes. Here are some immediate steps to take to alleviate the problem:

1. If your pipes have frozen, immediately locate your main water service valve and be prepared to immediately shut the water off at the first sign of any water leakage (as outdoor temperatures rise, the ice inside the pipe will melt and leaks may then be evident). This valve is generally located inside your home close to where the line comes in from the meter. For instance, if your meter is in your front yard, the service line extends from the meter, into the yard and into the front part of your house. The valve could be in a closet on your main floor or in the basement. It generally will look like a 'wheel' on the valve and, some instances the service valve could have a lever handle.

2. Turn on the closest faucet to the service valve (a trickle will do) to relieve pressure as the ice melts.

3. Use a blow dryer or space heater to thaw a frozen pipe. Place it 4-5 inches away from the pipe and let it blow until it is thawed. Be patient! This can be time consuming – don't even think about using a blowtorch or other open flame! It’s too dangerous!

4. Once thawed, wrap insulation around water pipes to prevent re-freezing. It is also a good idea to wrap insulation around pipes that are exposed to freezing temperatures, such as those in your garage.

5. Also, try leaving cabinet doors under the faucets open so they can get a bit more heat.

Latest News

image of clara barton parkway with lane closure marked in red

Beginning this week and continuing through mid-August, DC Water will temporarily close one lane overnight on Clara Barton Parkway at the Maryland-D.C. border. The closures are needed so crews can ...

Pennyfield Lock Potomac Interceptor bypass pipeline running next to C & O Canal with equipment

There is no active spill or overflow. Work to strengthen the pipe to begin soon.

Today, DC Water completed construction on a temporary bypass system as part of sewer repairs on the Potomac Interceptor near Pennyfield Lock in Potomac, Maryland. Crews turned on the pumps and successfully tested the system. With the bypass now ready, it will allow us to begin the emergency repairs inside the pipe by carrying the wastewater around the repair area.

DC Water Officials with NPS and ANC commissioners doing ceremonial groundbreaking

Today, DC Water broke ground on the Piney Branch Tunnel, the final major tunnel in our Clean Rivers Project. This work will help keep sewage and trash out of local waterways and make Rock Creek, the Potomac River, and the Chesapeake Bay cleaner for our community.

When we finish the Piney Branch Tunnel, it will hold at least 4.2 million gallons of rainwater and wastewater during heavy storms. Instead of overflowing into Piney Branch, that water will go to the Blue Plains Water Resource Recovery Facility, where it will be treated.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

DC Water Officials with NPS and ANC commissioners doing ceremonial groundbreaking
DC Water Breaks Ground on Piney Branch Tunnel, Final Phase of DC Clean Rivers Project

Today, DC Water broke ground on the Piney Branch Tunnel, the final major tunnel in our Clean Rivers Project. This work will help keep sewage and trash out of local waterways and make Rock Creek, the Potomac River, and the Chesapeake Bay cleaner for our community.

When we finish the Piney Branch Tunnel, it will hold at least 4.2 million gallons of rainwater and wastewater during heavy storms. Instead of overflowing into Piney Branch, that water will go to the Blue Plains Water Resource Recovery Facility, where it will be treated.

Latest Blog Post
Plastic bottles, cups and other floating debris on the surface of the Anacostia River before the Anacostia River Tunnel began operating.
Cleaner Waterways Start With Everyday Choices
Protecting our waterways starts with everyday actions and continues through critical infrastructure designed to keep pollution out of our rivers.
Upcoming Meeting
Date
July 28, 2026
Tuesday, 9:30 AM

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.