Statement on Security of Water Distribution System

February 09, 2021

In the wake of a reported cyber breach of the water treatment system in Oldsmar, Florida on Friday, February 5, DC Water Chief Executive Officer and General Manager David L. Gadis issued the following statement:

DC Water purchases drinking water from the Army Corps of Engineers’ Washington Aqueduct and distributes it across the District of Columbia. DC Water utilizes extensive physical and cyber security measures to prevent unauthorized access to its distribution systems and to protect the water supply. That includes conducting thousands of water quality tests annually throughout the city.

We never discuss our specific cyber security protections publicly, but I can assure you we are ever vigilant in protecting and monitoring our systems to ensure the safety and quality of the water we deliver. 
 

Latest News

Canal Rd slope showing areas with fallen rock

Off-Peak Lane Closures and Sidewalk Closure Begin This Week

Starting, Saturday, September 20, DC Water will begin construction to stabilize the slope on Canal Road NW between Foxhall Road (Glover-Archbold Trailhead) and the Georgetown University (GU) entrance.

Photo of completed repair with concrete encasing the sewr pipe

DC Water has successfully completed emergency repairs on a critical section of the Anacostia Force Main following a failure near Anacostia Avenue and Ponds Street Northeast in July. With repairs finalized, attention now turns to rehabilitating other vulnerable segments of the 6.25-mile pipeline to ensure long-term reliability and resilience. 

Map of construction area on Clara Barton Parkway near I495

DC Water will be doing construction as part of a sanitary sewer rehabilitation project on Clara Barton Parkway in Maryland from Sept 8 - Oct 10, 2025, which may cause delays inbound near the I-495 Beltway interchange. One lane will be closed in the work zone to reline an 800-foot section of the sewer line, known as the Potomac Inteceptor. Access to the inner and outer loops of the Beltway will remain available.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Canal Rd slope showing areas with fallen rock
DC Water to Begin Canal Road NW Slope Stabilization Project

Off-Peak Lane Closures and Sidewalk Closure Begin This Week

Starting, Saturday, September 20, DC Water will begin construction to stabilize the slope on Canal Road NW between Foxhall Road (Glover-Archbold Trailhead) and the Georgetown University (GU) entrance.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
September 18, 2025
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.