Public Hearing on Retail Rates Set for April 25, 2002

March 11, 2002

A hearing to review proposed rules to establish new retail rates for water and sewer services and to establish Metering and Right of Way Occupancy fees will be held:

Thursday, April 25, 2002
6:30 p.m.

Washington Convention Center
900 9th Street, N.W.
Washington, D.C. 20001
Room 29

The Board of Directors of the District of Columbia Water and Sewer Authority, in accordance with Section 216 of Water and Sewer Authority Establishment and Department and Public Works Reorganization Act of 1996, effective April 18, 1996 (D.C. Law 11-111; D.C. Code Section 34-2202.16, formerly D.C. Code Section 43-1686), will conduct a public hearing at the above-stated date, time, and place, to receive comment on proposed rules, which, if adopted, would establish new rates for retail water and sewer service and establish Metering and Right of Way Occupancy fees.

The proposed rules are published elsewhere in this edition of the D.C. Register.

Each individual or representative of an organization who wishes to present testimony at the public hearing is requested to furnish his or her name, address, telephone number and name of organization (if any) by calling 787-2330 no later than 5:00 p.m., Friday, April 19, 2002.

Oral presentations by individuals will be limited to five (5) minutes. Oral presentations made by representatives of an organization will not be longer than ten (10) minutes.

Latest News

Picture of wastewater in the street on Anacostia Ave NE during sanitary sewer overflow

A Sanitary Sewer Overflow (SSO) occurred early this morning, while performing ongoing repairs on the Anacostia Force Main in Northeast DC. At approximately 1:40 a.m. the sewer line experienced a short-term, unexpected surge in flow that exceeded the capacity. Clean-up is underway and is expected to be completed later today. 

logo of wssc water and dc water

With excessive rainfall forecasted for the region DC Water and WSSC Water are actively monitoring weather conditions and implementing mitigation strategies to minimize the risk of a controlled emergency sewage overflow from the Anacostia Wastewater Pumping Station (WWPS) in Capitol Heights, Maryland. This action would be taken as a last resort as the agencies work together to protect communities and the environment following the July 20 collapse of the 108-inch diameter Anacostia Sewer Force Main in Northeast Washington, D.C. near Kenilworth Aquatic Gardens.

WSSC Logo and DC Water logo

Weather key factor. Overflow from WSSC Water’s Anacostia Wastewater Pumping Station (WWPS) in Capitol Heights into Beaverdam Creek and Anacostia River is last resort. Would protect Northeast D.C. neighborhood after collapse of 108-Inch Diameter Anacostia Sewer Force Main.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Picture of previous rock slide on the slope
DC Water Revises Canal Road Slope Stabilization Plan in Response to Community Feedback

DC Water has revised its slope stabilization plan along Canal Road Northwest to significantly reduce traffic disruptions during construction.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
September 2, 2025
Tuesday, 10:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.