DC Water Searching For Next Water Drop Mascot

February 13, 2013

Do you have what it takes to be a water drop? If so, come out and show us what you got!

WHAT: DC Water will host free, public auditions to hire individuals to serve as its “Wendy/Wendell the Water Drop” mascot. Participants should be charismatic, energetic and outgoing. Mascot hopefuls will be required to perform some non-verbal movement and try on Water Drop costume.

WHO: DC Water External Affairs Staff

WHERE: Bryant Street Pumping Station, 3rd floor auditorium, 301 Bryant Street, N.W., Washington, D.C. 20001

WHEN: Friday, February 15, Noon - 5 p.m. and Tuesday, February 19, Noon - 5 p.m.

HOW: To schedule an audition, please contact Emanuel Briggs at (202) 787-2003 or send an email to emanuel.briggs@dcwater.com.

Latest News

Group Photo with homeowner

DC Water has hit a major milestone in its Lead Free DC (LFDC) program: the 10,000th lead service line replacement. To commemorate the achievement, we teamed up with Washington Football Legend and NFL Hall of Famer Darrell Green to surprise our honorary 10,000th replacement and homeowner. With this achievement, nearly 25% of the estimated lead service lines in the city have been replaced.

Map of construction area on Clara Barton Parkway near I495

DC Water will be doing construction as part of a sanitary sewer rehabilitation project on Clara Barton Parkway in Maryland from Sept 8 - Oct 10, 2025, which may cause delays inbound near the I-495 Beltway interchange. One lane will be closed in the work zone to reline an 800-foot section of the sewer line, known as the Potomac Inteceptor. Access to the inner and outer loops of the Beltway will remain available. Additional lane closure may be necessary intermittently through Oct 24, 2025.

Image of new pipe section with wastewater flowing

Major Milestone in Sewer Line Repair Near Great Falls

DC Water has completed the final connection on the rehabilitated section of the Potomac Interceptor near Great Falls, renewing an integral part of the region's sewer system. This achievement signals the new pipe section is now fully operational and represents a significant step in completing this complex and critical infrastructure project.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Aerial View of Construction near Watergate Complex Shows cranes and construction of drop shaft underway
Scaffolding Installation Begins near Watergate Complex for Potomac River Tunnel Project

Rock Creek and Potomac Parkway NW Beginning September 23, 2025, to Mid-November 2025

DC Water is installing temporary scaffolding at the Rock Creek Trail site, west of the Watergate Complex. Trail users are advised to adhere to flagger instructions during installation.

Scaffolding installation is expected to be completed by September 26, 2025, and will remain in place until mid-November 2025.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
October 16, 2025
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.