SMALL DIAMETER WATER MAIN REPLACEMENT PROJECT BARNABY WOODS AND HAWTHORNE NEIGHBORHOODS ADVISORY NEIGHBORHOOD COMMISSION 3 / 4 G

Georgia Ave, NW Trench_20171120

overview

As part of its Capital Improvement Program, DC Water is replacing existing 12-inch and smaller cast iron water mains in various locations throughout the city. Construction for this project will occur in the Barnaby Woods and Hawthorne neighborhoods (see construction location map on back). These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system.

scope of work

  • Installation of approximately 5,850 linear feet of 3-inch up to 16-inch water mains 
  • Replacement of service lines – including free private side replacement of lead and galvanized iron pipe 
  • Replacement of fire hydrants and valves 
  • Restoration of all surfaces disturbed by the project construction upon completion of the work

schedule

  • Construction start: October 2023 
  • Construction completion: February 2026 
  • Normal work hours: 9:30 AM to 3:30 PM, Monday through Friday 

The contractor may, at times, need to work at night or on weekends, dependent upon certain construction activities, or due to inclement weather.

important information

  • For all planned temporary water service shut-offs, affected residents will be notified 48 hours in advance. Service interruptions should be minimal. 
  • Construction activities such as these may cause temporary discolored water or low water pressure. If you experience discolored water, it is recommended that you flush your cold water tap from the lowest point inside your property for approximately 15 minutes. If your water does not clear after this process, please contact DC Water’s Water Quality and Technology Division, or our 24-hr Emergency/Command Center.

traffic

  • Lane closures and flagging operations may be required daily for each phase of construction to maintain traffic in the construction work zone. All Traffic Control Plans will be approved by the District Department of Transportation (DDOT). 
  • Notifications regarding “No-Parking” zones will be posted 72 hours prior to construction, in certain areas in and around the job site, as required by DDOT.

partners

DC Water is currently working closely with DDOT to ensure minimal disruption during this project. 

Regular updates will also be provided to impacted area residents, Advisory Neighborhood 

Commission 3/4G, Wards 3 and 4 representatives in the Mayor’s Office of Community Relations and Services, and Wards 3 and 4 Councilmembers Matthew Frumin and Janeese Lewis George and members of their staff.

Contact Information

FOR MORE INFORMATION, PLEASE CONTACT:

DC Water Project Manager: Lavine Harry (202) 787-7623 / lavine.harry@dcwater.com

DC Water Project Contractor: Fort Myer Construction Corp. - Jorge Baptista (202) 359-2969

DC Water Water Quality and Technology Division: (202) 612-3440

DC Water 24-hr Emergency/Command Center: (202) 612-3400

DC Water Office of Marketing and Communications: (202) 787-2200