Green Alley Partnership

2017 0418 AlleyPalooza Logo for Website.jpg

Overview

The AlleyPalooza Campaign is Mayor Muriel Bowser’s initiative to focus on alley reconstruction in the District of Columbia.  DC Water through its Clean Rivers Project partnered with DDOT to construct a type of green infrastructure (GI) called permeable pavement in alleys (or green alleys) to benefit the rivers and ratepayers in the District of Columbia. Permeable pavement is a GI technique that mimics natural conditions to capture, filter and slowdown stormwater runoff before entering the combined sewer system. 

To date, the Green Alley Partnership constructed permeable pavement in one alley in Ward 2 within the Potomac River sewershed and six alleys in Wards 1 and 4 within the Rock Creek sewershed. Residents and ratepayers benefit through reconstructed alleys and by the implementation of GI helping to prevent combined sewer overflows (CSOs) into the Potomac River and Rock Creek. DDOT and DC Water continue to look for partnership opportunities.

Project Area

Find the seven green alleys (green dots) constructed within the Potomac River and Rock Creek combined sewer areas through the Green Alley Partnership by clicking on the interactive map below:

Benefits

Improves the Environment
The Green Alley Partnership helps to reduce pollution into local creeks and rivers by replacing impervious pavement with permeable pavement.    

Saves Money
The partnership between DDOT and DC Water allowed cost sharing between the two entities optimizing resources and expertise, and reducing the financial impact to tax and ratepayers in the District.

Saves Time
This partnership allows DC Water to construct alleys faster by utliizing DDOT's AlleyPalooza contracts.

Reduces Disruption
Because both DDOT’s and DC Water's work was constructed under the same effort, there was less construction disruption in the neighborhoods where the alleys are located.  

Maintenance

To ensure continued performance of GI and the associated reduction of combined sewer overflows, the GI facilities must be maintained regularly.  DC Water is responsible for maintenance of GI facilities. If you notice trash or other issues in the facilities, please contact DC Water and note the Facility ID located on the sign.  Facility ID signs can be found at each GI facility that DC Water constructed in your neighborhood. For more information, see the GI Maintenance Factsheet in the Project Documents above.

Discover More

Click here to learn more about DC Water's green infrastructure projects.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

DC Water Officials with NPS and ANC commissioners doing ceremonial groundbreaking
DC Water Breaks Ground on Piney Branch Tunnel, Final Phase of DC Clean Rivers Project

Today, DC Water broke ground on the Piney Branch Tunnel, the final major tunnel in our Clean Rivers Project. This work will help keep sewage and trash out of local waterways and make Rock Creek, the Potomac River, and the Chesapeake Bay cleaner for our community.

When we finish the Piney Branch Tunnel, it will hold at least 4.2 million gallons of rainwater and wastewater during heavy storms. Instead of overflowing into Piney Branch, that water will go to the Blue Plains Water Resource Recovery Facility, where it will be treated.

Latest Blog Post
Five photos from the American Water Works Association (AWWA) ACE26 conference featuring panel discussions, technical presentations, networking, and attendees posing at the ACE26 display.
ACE26 Highlights: How DC Water Advanced the Conversation on Water
More than 80 DC Water employees joined thousands of water professionals in Washington, D.C., sharing expertise, building partnerships and advancing conversations that will help shape the future of water.
Upcoming Meeting
Date
July 13, 2026
Monday, 2:00 PM

Upcoming Events

Jul 23
Jul 25

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.