Green Alley Partnership

2017 0418 AlleyPalooza Logo for Website.jpg

Overview

The AlleyPalooza Campaign is Mayor Muriel Bowser’s initiative to focus on alley reconstruction in the District of Columbia.  DC Water through its Clean Rivers Project partnered with DDOT to construct a type of green infrastructure (GI) called permeable pavement in alleys (or green alleys) to benefit the rivers and ratepayers in the District of Columbia. Permeable pavement is a GI technique that mimics natural conditions to capture, filter and slowdown stormwater runoff before entering the combined sewer system. 

To date, the Green Alley Partnership constructed permeable pavement in one alley in Ward 2 within the Potomac River sewershed and six alleys in Wards 1 and 4 within the Rock Creek sewershed. Residents and ratepayers benefit through reconstructed alleys and by the implementation of GI helping to prevent combined sewer overflows (CSOs) into the Potomac River and Rock Creek. DDOT and DC Water continue to look for partnership opportunities.

Project Area

Find the seven green alleys (green dots) constructed within the Potomac River and Rock Creek combined sewer areas through the Green Alley Partnership by clicking on the interactive map below:

Benefits

Improves the Environment
The Green Alley Partnership helps to reduce pollution into local creeks and rivers by replacing impervious pavement with permeable pavement.    

Saves Money
The partnership between DDOT and DC Water allowed cost sharing between the two entities optimizing resources and expertise, and reducing the financial impact to tax and ratepayers in the District.

Saves Time
This partnership allows DC Water to construct alleys faster by utliizing DDOT's AlleyPalooza contracts.

Reduces Disruption
Because both DDOT’s and DC Water's work was constructed under the same effort, there was less construction disruption in the neighborhoods where the alleys are located.  

Maintenance

To ensure continued performance of GI and the associated reduction of combined sewer overflows, the GI facilities must be maintained regularly.  DC Water is responsible for maintenance of GI facilities. If you notice trash or other issues in the facilities, please contact DC Water and note the Facility ID located on the sign.  Facility ID signs can be found at each GI facility that DC Water constructed in your neighborhood. For more information, see the GI Maintenance Factsheet in the Project Documents above.

Discover More

Click here to learn more about DC Water's green infrastructure projects.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Christening of TBM Emily with DC Water Interim General Manager Matt Brown holding bottle of tap water to christen Emily
DC Water Welcomes the Community Underground to See the Potomac River Tunnel and Christens Tunnel Boring Machine Emily

DC Water celebrated the christening of Emily today. It’s the second giant tunnel boring machine (TBM) that will help build the 5.5-mile Potomac River Tunnel. The celebration continued with Community Day. Residents and families met Emily and stepped inside the tunnel where she will soon begin digging.

Latest Blog Post
Emergency supplies arranged on a table, including bottled water, canned food, a backpack, first aid kit, flashlight, phone, medication and other essential items.
Simple Ways to Stay Prepared at Home
A few simple steps can help your household prepare for severe weather and temporary water or sewer service interruptions.
Upcoming Meeting
Date
October 8, 2026
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.