Investments in Infrastructure are Investments in our Future

Investments in Infrastructure are Investments in our Future

In the District of Columbia, most of the sewer system is a separate sewer system. In separate sewer systems, sewage and stormwater are carried through different pipes. Sewage pipes carry raw wastewater to the Blue Plains Advanced Wastewater Treatment Plant and stormwater pipes carry rainwater to local waterways. However, about 1/3 of the District has an older, combined sewer system, or CSS. In combined sewer systems, one pipe carries both wastewater and stormwater runoff.

When it rains heavily in areas served by a combined sewer system, the stormwater and wastewater flow through the same pipe. Some of the pipes aren't big enough to handle the flows of very large rainstorms. Rather than have sewage back up into homes and streets, the combined sewer system sends the overflow water to the local waterways. The result is called a combined sewer overflow, or CSO.

To improve the health of our waterways, DC Water has implemented a large-scale, long-term plan to reduce CSOs in local waterways-our Clean Rivers Project. We will separate the sewer pipes, eliminate several CSO outfalls, build storage tunnels and install green infrastructure. Together, these efforts will significantly improve water quality in the District’s waterways.

By the year 2025, we expect to reduce CSOs in the Potomac and Anacostia rivers and Rock Creek by 96% overall. CSOs in the Anacostia will be reduced by 98%.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.