EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC Water's

Projects

Our capital improvement plan is measured in the billions. That's the level of investment required to upgrade our water and sewer systems, comply with federal mandates to reduce nutrient discharges and combined sewer overflows to local rivers, and improve the efficiency of our operations. This work is occurring across the city, and using the search filters below you can see what's happening in your neighborhood.

Click to view current and planned DCWater projects by Ward or ANC.

Sewer
The Anacostia Force Main (AFM) is a 33,000-foot pipeline made of 108-inch diameter prestressed concr
Sewer
As part of its Capital Improvement Program, DC Water will be performing sanitary sewer rehabilitatio
Sewer
As part of its ongoing program to inspect, evaluate, and rehabilitate sewers across the city, DC Wat
Sewer
As part of its Capital Improvement Program, DC Water will be performing a sanitary sewer rehab
Sewer
The Rock Creek Main Interceptor (RCMI) is a major sewer line carrying 100 million gallons of wastewa
Sewer
During routine inspections, DC Water identified structural issues and the need for immediate repairs
Sewer
Extending the service life of the local sewer system
Sewer
Extending the service life of the local sewer system
Potomac Interceptor, Sewer
Potomac Interceptor Project
Sewer
More detailed information can be found below
Sewer
These efforts will help improve water quality and system reliability.
Sewer
PINEY BRANCH SEWER REHABILITATION PROJECT ADVISORY NEIGHBORHOOD COMMISSIONS 4B, 4C, 4D & 4E
Sewer
This initiative will help in monitoring the structural condition of the sewer network components as
Sewer
This initiative will help in monitoring the structural condition of the sewer network components as
Sewer
This initiative will help in monitoring the structural condition of the sewer network components as
Sewer
This initiative will help in monitoring the structural condition of the sewer network components as

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.