Tingey Street Diversion Sewer Project

CSO 013 Diversion Chamber Access Points

Overview

In January 2012, DC Water entered into a unique public‐private partnership with "The Yards" developer Forest City to design and construct the Tingey Street Diversion Sewer, an important facility to mitigate combined sewer overflows to the Anacostia River. To accommodate the opening of several key components of “The Yards,” a strategy was needed to advance the Tingey Street Diversion Sewer through the central portion of the mixed-use development earlier than previously planned to mitigate impacts to the community and the redevelopment of the Navy Yard.

The solution was found through innovation and collaboration. After entering into an agreement with DC Water, Forest City managed the competitive solicitation for contractors and the design and construction process. Forest City successfully constructed the 72-inch diameter tunnel, two diversion chambers, and a junction manhole as part of the development project, while maintaining the schedule of "The Yards." 

Schedule

The construction of the Tingey Street Diversion Sewer was completed in January 2014 and will be placed into permanent operation in March 2018 when the Clean Rivers system is brought online.

Project Location Map

Tingey Street Diversion Sewer Area Map

clean river
Clean Rivers

The Clean Rivers Project is DC Water's ongoing program to reduce combined sewer overflows into the District's waterways - the Anacostia and Potomac Rivers and Rock Creek. The Project is a massive infrastructure and support program designed to capture and clean water during heavy rainfalls before it ever reaches our rivers.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.