EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC Water At A Glance

History

The District of Columbia Water and Sewer Authority (DCWASA) was created by District law in 1996, with the approval of the United States Congress, as an independent authority of the District Government with a separate legal existence. In 2010 the Authority rebranded and became DC Water. 

 

Service Area

DC Water provides more than 700,000 residents and 27 million annual visitors in the District of Columbia with retail water and wastewater (sewer) service. With a total service area of approximately 725 square miles, DC Water also treats wastewater for approximately 1.8 million people in neighboring jurisdictions, including Montgomery and Prince George’s counties in Maryland and Fairfax and Loudoun counties in Virginia.

 

Pumped and Treated Water Storage

During Fiscal Year 2024, DC Water pumped an average of more than 100 million gallons of water per day. In addition, DC Water stores 60 million gallons of treated water at its eight facilities. The Washington Aqueduct stores an additional 49 million gallons.

 

Water Distribution System

DC Water delivers water through 1,300 miles of interconnected pipes, four pumping stations, four reservoirs, three water tanks, 43,860 valves, and 9,510 fire hydrants.

 

Sewer System

DC Water operates 1,900 miles of sanitary and combined sewers, nine wastewater pumping stations, 16 stormwater pumping stations, 12 inflatable dams and a combined sewer swirl facility. 

 

Blue Plains

Blue Plains Advanced Wastewater Treatment Plant is located at the southernmost tip of the District, covering more than 150 acres along the Potomac River. Blue Plains is the largest advanced wastewater treatment facility in the world.

 

Wastewater Treatment Capacity

Blue Plains treats an annual average of 294 million gallons per day (MGD) and has a design capacity of 384 MGD, with a peak design capacity to treat more than 780 million gallons per day.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.