EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

What lies beneath?

June 19, 2008

Drinking water is a critical public service and one that most of us take for granted. We expect it to be there when we turn on the tap or flush the toilet. Not many of us think about the 1,300 miles of pipelines and the 36,000 valves that bring the water to us. They’re out of sight, out of mind. At least until there’s a problem, like a water main break that could damage roadways, cause traffic delays and put homes and businesses out of water until repairs are made.
According to the American Water Works Association (AWWA), much of our drinking water infrastructure was constructed between 80 and 100 years ago, and the cost of repairing and replacing these aging pipelines ranges between $280 to $400 billion. That means we will pay more for water, and it’s an investment worth making.
Much of the District’s water system is made out of cast iron pipes, some of which are more than 100 years old. Since its creation in 1996, DC WASA has made significant progress in stabilizing the city’s water infrastructure. But, there’s much more to be done. In its 10-year Capital Improvements Program, DC WASA plans to spend more than $600 million on water system improvements.
Out of sight, out of mind doesn’t work for infrastructure; not for the maze of pipelines, much of which were laid before most of us were born, that delivers a product that’s critical to our health, public safety, and quality of life.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.