EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Washington Aqueduct Returns to Chloramine to Disinfect Area Tap Water

May 24, 2023

This week, the Washington Aqueduct's water treatment plants resumed using chloramine (chlorine plus ammonia) for drinking water disinfection. The Washington Aqueduct treats and provides water to the District of Columbia and other regional municipalities. Chloramine provides long-lasting protection as water flows through the District’s large distribution system and to the tap. Chloramine also lowers the levels of certain byproducts of water disinfection, known as disinfection byproducts (DBPs). In February, the Aqueduct temporarily switched to free chlorine instead of chloramine, which is a standard practice in the water utility industry. It is performed annually to keep water mains clean and free of potentially harmful bacteria throughout the year. As always, the District of Columbia Water and Sewer Authority (DC WASA) will monitor the drinking water regularly to ensure it meets or exceeds federal Safe Drinking Water Act standards. Customers may continue to notice a chlorine taste and odor for an additional week before the chloramine reaches the entire water distribution system. This taste may be reduced by refrigerating a pitcher of drinking water overnight. Individuals and business owners who normally take special precautions to remove chloramine from tap water, such as dialysis centers, medical facilities, and aquatic pet owners, should make sure they continue with these precautions as the disinfectant returns to chloramine again. For more information, contact the Drinking Water Division at (202) 612-3440 www.dcwater.com/waterquality. After hours, customers may call the 24-hour Emergency Call Center at 202-612-3400.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.