EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

WASA Proposes Rate Increase for Water and Sewer Services

March 18, 2008

The District of Columbia Water and Sewer Authority (WASA) Board is considering a proposed 8.5 percent rate increase for water and sewer services, effective October 1, 2008. WASA provides water and wastewater collection and treatment services for retail customers in the District. Gradual rate increases are required to cover the costs of WASA’s 10-year, $3.1 billion capital improvement program to upgrade the District’s water and sewer infrastructure and to meet expanding federal requirements for controlling water pollution.

If approved, the combined water and sewer rate would increase from $5.37 per hundred cubic feet (Ccf) to $5.83 per Ccf. In addition to this increase, the Right-of-Way/Payment In Lieu Of Taxes (PILOT) fee will increase from $0.47 per Ccf to $0.52 per Ccf, divided as follows: Payment in Lieu of Taxes to the District of Columbia - $0.39 per Ccf; and District of Columbia Right-of-Way fee - $0.13 per Ccf. These fees are charged to WASA by the District of Columbia government, and are passed through as a separate line item on the WASA bill. Under the current proposal, the typical residential customer’s monthly bill would increase by approximately $4.24 per month (based on an average monthly usage of 8.33 (Ccf) or 6,231 gallons of water).

The proposed rate increases will be extensively publicized and discussed at a number of community meetings and a formal hearing. Included in this year’s public discussion on rate adjustments will be WASA’s proposed policy to implement a separate impervious surface rate structure. Rather than use the per-gallon water purchase rate, to pay for the $2.2 billion combined sewer overflow (CSO) control plan, this separate proposal for a new rate structure, effective with the April 2009 bill, would be based on the amount of impervious area on each property producing water runoff entering the city’s sewer system.

Two public hearings are scheduled. Information follows below.

-Wednesday, June 11, 2008 from 6:30-8:30 pm at the Council of Governments (COG) 777 North Capitol Street, NE.

-Monday, June 23, 2008 from 10:00 am to 12:00 noon at the Council of Governments (COG) 777 North Capitol Street, NE.

Additional information on WASA’s rate proposal is available by calling the Office of Public Affairs at (202) 787-2200.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.