EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

WASA Issues Summary of 2004 Water Testing Results

March 12, 2004

(Washington, DC) Test results of water samples collected from early February to March 8, 2004 and released by the DC Water and Sewer Authority (WASA) today show lead levels that are measurably lower than last year’s test results. Approximately 73 percent of the "second draw" samples tested had water lead levels at or below the U.S. Environmental Protection Agency’s (EPA) action level of 15 parts per billion (ppb) after running the cold water faucet until there was a change in temperature.

The 1,752 samples were from a variety of service line materials. Of the 621 samples from homes with lead line service, 52 percent had results of 15 ppb or less in "second draw" samples, collected by customers after a noticeable change in water temperature.

"These results appear to support our primary focus on properties served by lead service lines," said Michael Marcotte, WASA deputy general manager and chief engineer. "Additionally, the overall trend in lead levels is encouraging."

In last year’s water lead testing, 33 percent of the 6,118 samples were below the EPA action level.

More than 90 percent of the total first draw and second draw from service line materials other than lead were below 15 ppb for first draw collections indicating that properties served by these service lines experience much lower levels of lead.

"First draw" results relate to faucet and nearby internal plumbing impact while "second draw" results are indicative of service line impact on water quality.

Approximately 3,000 additional sampling results are expected next week.

The chart showing these results is attached

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.