EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

TRAFFIC ADVISORY: Lane Closure NB Clara Barton Parkway at Chain Bridge, March 8

March 07, 2025
Picture of Chain Bridge at location of manhole where work will occur

On Saturday, March 8, DC Water will close the outbound lane of Clara Barton Parkway at Chain Bridge to inspect a section of the Potomac Interceptor, a major sewer line which crosses the Potomac River.

The lane closure will begin at 8 a.m. and continue until 3 p.m. During the inspection, DC Water and its contractor will be working in the outbound lane past Chain Bridge to access the sewer line through a manhole in the roadway.

Motorists are advised to follow directional signage and the instruction of flaggers. Traffic will alternate in both directions utilizing one lane. Drivers may also use MacArthur Blvd as an alternative to Clara Barton Parkway.

As part of the inspection, DC Water will use a camera on closed circuit TV to go into the sewer line. It’s part of routine preventative maintenance to identify any defects or issues that could compromise the pipe and make repairs if necessary to maintain reliable sewer service.

The Potomac Interceptor is a 54-mile long sewer line that runs from areas near Dulles International Airport to Maryland and DC Water’s Blue Plains Advanced Wastewater Treatment Plant. The line crosses the Potomac in three location, one of them at Chain Bridge. It’s a key infrastructure asset, transporting 60 million gallons of wastewater daily.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.