EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

PUBLIC MEETING ON PROJECTS TO CONTROL COMBINED SEWER OVERFLOWS TO THE ANACOSTIA RIVER

September 16, 2009

Who: The District of Columbia Water and Sewer Authority (DC WASA) invites citizens, employees and interested parties in the District of Columbia to this public meeting

What: Public meeting on the projects to control combined sewer overflows to the Anacostia River

When: September 17, 2009 — 6:00 p.m.

Where: Washington Highlands Library, 115 Atlantic Avenue, SW

Background:
DC WASA is implementing a Long Term Control Plan (LTCP) to control combined sewer overflows (CSOs) to the Anacostia and Potomac Rivers and Rock Creek. The Authority is preparing an Environmental Information Document (EID) for Anacostia River CSO Control Projects located between the Authority’s advanced wastewater treatment plant at Blue Plains and RFK Stadium.

# # #

About The District of Columbia Water and Sewer Authority
The District of Columbia Water and Sewer Authority (DC WASA) is an industry-leading authority of District government that provides drinking water and wastewater collection and treatment for a population of more than 500,000 in the District of Columbia. DC WASA also treats wastewater for a population of 1.6 million in Montgomery and Prince Georges counties in Maryland, and Fairfax and Loudoun counties in Virginia. The Authority operates the world’s largest advanced wastewater treatment plant, with a capacity of 370 million gallons per day and a peak daily capacity of more than a billion gallons. DC WASA’s service area covers approximately 725 square miles.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.